13.07.2015 Views

UIC Project Annual Report - ERTMS

UIC Project Annual Report - ERTMS

UIC Project Annual Report - ERTMS

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ETCS<strong>UIC</strong> code I/92/E/051<strong>Annual</strong> <strong>Report</strong> 2004 DOCUMENT CODIFICATION REV. PAGEC 14 of 213.6 Corridor IV and Corridor XIt has been agreed that <strong>UIC</strong> shall continue to support the establishment of <strong>ERTMS</strong> in thiscentral European Region. In general, it shall be considered if GSM-R voice will be introduced aspart of the upgrade of the operation of the concerned corridors. Special focus is put onCorridors IV and X.3.6.1 Expectations for corridor IV (MAV and CFR part)A first border-crossing meeting is planned for the middle of February between <strong>UIC</strong>, MAV, CFRand EU for the official presentation of the strategy for this line to EU, agree on the nextmilestones, the presentation of the call for offer documentation, the presentation of theimplementation and testing strategy, the presentation of the time plans etc.3.6.2 Expectations for Corridor X (SZ, HŽ, ŽTP Belgrade, NRIC parts)The Slovenian Railways plan to work on an economic analysis for the implementation of ETCSon the Zidani Most - Dobava line, and after that on a time plan for embedding the ETCS systemon this line.HŽ (the Croatian Railways) want to accomplish a Strategic Study of ETCS and GSM-Rimplementation on all corridor lines in Croatia.A meeting together with the Serbian-Montenegrin Railways is provided for in the first quarter ofthe year.Together with Institute ''Kirilo Savić'' and the Ministry for Science and Research, the Serbian-Montenegrin Railways (ŽTP Belgrade) want to make a Strategic Study of ETCS and GSM-Rimplementation on all Corridor X lines in Serbia-Montenegro.Bilateral meetings with the Croatian and the Bulgarian Railways are foreseen very soon.The intensive work on scenarios for all cross-border stations is on-going.It is evident that there is a need for one or two workshops on the topics FRS and SRS of theETCS system and to clarify some requirements.3.6.3 Activities in NRIC – BulgariaNRIC and ŽTP Belgrade agreed upon the cross-border line section. Four stations on theBulgarian and three stations on the Serbian-Montenegrin side will be included in the pilotsection. The four stations on the Bulgarian part are Kalotina zapad, Kalotina, Dradoil andDragoman. Also under consideration is the possibility that all the stations (9 in total) from theSerbian border to Sofia may be included.The electrification from Dragoman to the border is ongoing. The deadline for the completion ofconstruction and power supply was the end of 2004.For the pilot project, the requirements (functional and system) to the ETCS system will be thesame as for the present project Sofia – Plovdiv – Burgas.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!