13.07.2015 Views

UIC Project Annual Report - ERTMS

UIC Project Annual Report - ERTMS

UIC Project Annual Report - ERTMS

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ETCS<strong>UIC</strong> code I/92/E/051<strong>Annual</strong> <strong>Report</strong> 2004 DOCUMENT CODIFICATION REV. PAGEC 9 of 212.3.5. Feasibility study for a guideline for ETCS implementationIt was originally planned that the handbook for implementation should have been finalised bythe end of 2004. Due to serious illness of the key person in question, the handbook will bedelayed for some months. It is the aim to test the contents of the handbook for a level 1application in connection with the planning and execution of the CFR part of the ETCS projecton Corridor IV. A level 2 application should be selected for tests in a similar way.2.3.6. Feasibility study for a guideline for ETCS educationThis study aims to focus on the education needed especially at the driver’s level, which is veryimportant for the success of the ETCS system. We are still looking for a candidate withoperational experience to be the leader of this study.2.3.7. Activities on Corridor IV and Corridor X2.3.7.1 Status for the CFR part of Corridor IV (Bekescsaba – Arad, MAV-CFR)CFR and the ETCS project have investigated several aspects of possible ETCS implementationscenarios for the CFR network. One specific application of interest for several countries wasspecifically looked at as CFR has today all signals equipped with the “old” INDUSI 60, includingmany 500 Hz INDUSI magnets. The onboard functionality of reading the 500 Hz magnet is onebasic difference between the “Old” I 60 version and the updated PZB 90 version of the INDUSIsystem which is in operation e.g. at DB. As many countries in this Central European regionhave the I 60 version of INDUSI in service, <strong>UIC</strong> considered together with some of the concernedrail administrations on corridor IV and X that a transition from the INDUSI I 60 system via the newmode ETCS LS (Limited Supervision) towards an ETCS level 1 application could be aninteresting topic to have analysed. Several scenarios identifying different applications areavailable.<strong>UIC</strong> has also been supporting the elaboration of the call for offer document for the Romanianpart of Corridor IV using and testing the new <strong>UIC</strong> template for call for offer documents.2.3.7.2 Status for Corridor X activities performed in 2004In February, a first co-ordination meeting for Corridor IV and X Railways together with theindustry was held in Vienna.The aim of the meeting was to continue the work on the Corridors based on the distributedproposal. The <strong>UIC</strong> has also provided a ''Common Template for Call for Offers''. The transitionfrom INDUSI towards ETCS was discussed.On 28 and 29 Aprilin Belgrade, a presentation of the implementation of the <strong>ERTMS</strong>/ETCSsystem on Corridor X was held with the purpose to make signal and traffic engineers familiarwith the system.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!