ETCS<strong>UIC</strong> code I/92/E/051<strong>Annual</strong> <strong>Report</strong> 2004 DOCUMENT CODIFICATION REV. PAGEC 16 of 21This inventory will be carried out in 2005 in the context of other business decisions on futuretraffic and investment needs and accordingly <strong>UIC</strong> is going to co-ordinate this activity veryclosely with the wider European Railway Infrastructure Masterplan (ERIM), which will also studyoth er infrastructure investment and traffic forecasts on the same network corridors.4 Management and co-ordination aspectsThe <strong>ERTMS</strong>/ETCS project will coordinate the activities with the AEIF CCS, CCM, CCSC andCCB organisation (the AEIF change request organisation) and other relevant projects inside theIntegrated <strong>ERTMS</strong> projects, especially EURO-interlocking, but also GSM-R work will beensured.5 List of Deliverables 2004Basic deliverables of the <strong>UIC</strong> ETCS project is on one side support to the ETCS ongoingactivities by participating in meeting, preparing documents for matters to be discussed and onthe other side documents/reports which are available−−−−−−−−−−−−−Common template for call for offers.Comparison of <strong>UIC</strong> Corridor study in relation to Van Miert priority projects Participatingin the AEIF TSI CCS groupSupporting the infill Euroloop change request (ÖBB, RENFE, BDK, CFR)DB AG, BV, SZ, NetworkSupporting the Danish Authorities in corporation with the EEIG on the progressing onthe change request Awakening on Loop in level 1Limited Supervision – Final FRS and scenarios.− Documents for the <strong>ERTMS</strong> Conference – Rome, 15-17 December 2004.−<strong>Project</strong> annual report 2003.ETCS Cost/Benefit analysis.Allocation of NID C, NID Engine, NID X user, NID STM in the ETCS Assignment ofVariables document uploading on the <strong>UIC</strong> side when relevantParticipating in the AEIF CCB change control boardSupporting the level crossing change request (PKP, CD, BDK,Rail)Supporting the new mode limited supervision change request(DB AG, SBB, CFR, SNCB, BDK)ETCS status reports.Interim report on Corridor IV.Braking curves – Test report DB.
ETCS<strong>UIC</strong> code I/92/E/051<strong>Annual</strong> <strong>Report</strong> 2004 DOCUMENT CODIFICATION REV. PAGEC 17 of 21− Braking curves – Final test evaluation report.− Braking curves – Enquiry on braking safety margins – Recommendations for inputs into<strong>ERTMS</strong> braking curves (warning, service and emergency).− Safety margin – Risk factor report− Safety margin – Algorithm test case report.6 List of the <strong>UIC</strong> Steering group meetings heldThe 32 nd meeting of the ETCS Steering Group was held on 19 March 2004 in Brussels.rdThe 33 meeting of the ETCS Steering Group was held on 28 September 2004 in Paris.The agendas and/or minutes of the ETCS / ETCS-LC Steering Group meetings can be found onthe <strong>UIC</strong> ETCS web site under Meetings & Events – ETCS Steering Group meetings(http://etcs.uic.asso.fr/m_steering.html).ANNEX - MS <strong>Project</strong> Planning<strong>Project</strong>plan ver. 8.3 dated 09/10/2004.