13.07.2015 Views

VF Series C Vertical Floor Fan Coil Unit - Enviro-Tec

VF Series C Vertical Floor Fan Coil Unit - Enviro-Tec

VF Series C Vertical Floor Fan Coil Unit - Enviro-Tec

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FORM ET115.24-NOM10 (1210)replaced in warranty. All shipments returned to the factory MUST be marked with a Return Authorization Number,which is provided by the factory.All equipment and components sold through the Parts Department are warranted under the same conditions as thestandard manufacturer’s warranty with the exception that the warranty period is 12 months unless the component isfurnished as warranty replacement. Parts furnished as warranty replacements are warranted for the remaining termof the original unit warranties.SECTION 4 - INSPECTION, INSTALLATION & START-UP CHECKLISTReceiving & Inspectiono <strong>Unit</strong> received undamagedo <strong>Unit</strong> arrangement/hand correcto <strong>Unit</strong> received complete as orderedo <strong>Unit</strong> structural support complete and correctHandling and Installationo <strong>Unit</strong> mounted level and squareo Proper electrical service providedo Proper service switch/disconnect providedo Proper chilled water line size to unito Proper refrigerant line sizes to unito Proper steam condensate trap on return lineo All services to unit in code complianceo Proper access provided for unit and accessorieso Proper overcurrent protection providedo Proper hot water line to unito Proper steam line sizes to unito Proper steam supply pressure to unit(15psi max)o All shipping screws and braces removedCooling/Heating Connectionso Protect valve package components from heato Connect field piping to unito Install drain line and traps as requiredo Install condensate pan under piping as requiredo Mount valve packageso Pressure test all piping for leakso Insulate all piping as requiredo If the valve package connection at the coil ismade with a union, the coil side of the unionmust be prevented from twisting ("backed up")during tightening to prevent damage to the coiltubing. Over-tightening must be avoided toprevent distorting the union seal surface anddestroying the union.Ductwork Connectionso Install ductwork, fittings and grilles as requiredo Control outside air for freeze protectiono Proper supply and return grille type and size usedo Insulate all ductwork as requiredElectrical Connectionso Refer to unit wiring diagramo All field wiring in code complianceo Connect incoming power service or services<strong>Unit</strong> Startupo General visual unit and system inspectiono Record ambient temperatureo Close all unit isolation valveso Fill systems with water/refrigeranto All ductwork and grilles in placeo Start fans, etc.o Check all ductwork and units for air leakso Record all final settings for future useo Check all dampers for proper operationo Verify proper heating operationo Check all piping for leakageo Record electrical supply voltageo Check all wiring for secure connectionso Flush water systemso Vent water systems as requiredo All unit panels and filters in placeo Check for overload condition of all unitso Balance air systems as requiredo Check piping and ductwork for vibrationo Verify proper cooling operationo Reinstall all covers and access panels16ENVIRO-TEC ®

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!