13.07.2015 Views

Analysis of Air Transportation Systems Fundamentals of Aircraft ...

Analysis of Air Transportation Systems Fundamentals of Aircraft ...

Analysis of Air Transportation Systems Fundamentals of Aircraft ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

III) Landing and Take<strong>of</strong>f Runway LengthReconciliationSince the runway needed for take<strong>of</strong>f is larger than that required toland select the take<strong>of</strong>f runway length as this is the critical dimension.RL = 2,800 metersNOTE: This procedure accounts for wet runways so no furthercorrection is needed.Virginia Tech - <strong>Air</strong> <strong>Transportation</strong> <strong>Systems</strong> Laboratory 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!