13.07.2015 Views

Staff Report and WELO Ordinance - StopWaste.Org

Staff Report and WELO Ordinance - StopWaste.Org

Staff Report and WELO Ordinance - StopWaste.Org

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

H. Irrigation Schedules. Irrigation schedules satisfying the following conditionsshall be submitted as part of the l<strong>and</strong>scape documentation package.1. An annual irrigation program with monthly irrigation schedules shall berequired for the plant establishment period, for the established l<strong>and</strong>scape, <strong>and</strong> forany temporarily irrigated areas.2. The irrigation schedule shall:a. Include run time (in minutes per cycle) suggested number ofcycles per day, <strong>and</strong> frequency of irrigation for each station; <strong>and</strong>b. Provide the amount of applied water (in 100 cubic feet <strong>and</strong>gallons) recommended on a monthly <strong>and</strong> annual basis.3. The total amount of water for the project shall include water designatedin the estimated total water use calculation including any water needed for anywater features.4. Recreational areas designated in the l<strong>and</strong>scape design shall behighlighted <strong>and</strong> the irrigation schedule shall indicate if any additional water isneeded above the maximum applied water allowance because of high plantfactors (but not due to irrigation inefficiency).5. Whenever possible, irrigation scheduling shall incorporate the use ofevapotranspiration data such as those from the California Irrigation ManagementSystem (CIMIS) weather stations to apply the appropriate levels of water fordifferent climate.6. L<strong>and</strong>scape irrigation shall normally be scheduled during nondaylighthours to reduce irrigating during times of high wind or high temperature.I. Maintenance Schedules. A regular maintenance schedule satisfying thefollowing conditions shall be submitted as part of the l<strong>and</strong>scape documentationpackage:1. L<strong>and</strong>scaping shall be maintained to ensure water efficiency. A regularmaintenance schedule shall include, but not be limited to, checking, adjusting,<strong>and</strong> repairing irrigation equipment, resetting the automatic controller, aerating<strong>and</strong> dethatching turf areas, replenishing mulch; fertilizing; pruning, <strong>and</strong> weedingin all l<strong>and</strong>scaped areas.2. Repair of irrigation equipment shall be done with the originally specifiedmaterials or their equivalents.J. L<strong>and</strong>scape Irrigation Audit Schedules. A schedule of l<strong>and</strong>scape irrigationaudits, for all but single-family residences, satisfying the following conditions shallbe submitted to the city as part of the l<strong>and</strong>scape documentation package:1. At a minimum, audits shall be in accordance with the State of CaliforniaL<strong>and</strong>scape Water Management Program as described in the L<strong>and</strong>scapeIrrigation Auditor H<strong>and</strong>book.2. The schedule shall provide for l<strong>and</strong>scape irrigation audits to beconducted by certified l<strong>and</strong>scape auditors once every five years. Thisrequirement shall be waived if, in the last five years, the project has not at anytime used more water on an annual basis than permitted by the maximumapplied water allowance.1028

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!