13.07.2015 Views

Staff Report and WELO Ordinance - StopWaste.Org

Staff Report and WELO Ordinance - StopWaste.Org

Staff Report and WELO Ordinance - StopWaste.Org

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Draft 10-13-10purposes of 13.25.060(F)(1), may be separate from but use the same format as thel<strong>and</strong>scape design plan, <strong>and</strong> shall be drawn on project base sheets at a scale that accurately<strong>and</strong> clearly identifies <strong>and</strong> includes the following:a. The grading plan shall indicate finished configurations <strong>and</strong> elevations of thel<strong>and</strong>scaped area, including the height of graded slopes, drainage patterns, pad elevations,<strong>and</strong> finish grade. It should also include existing spot elevations at the base of each existingshrub or tree that will remain, including proposed elevation changes within their drip lines.b. The grading plan shall include specifications to avoid topsoil compaction.Additionally, if storage space exists, the grading plan shall indicate areas to stockpile topsoilfor reincorporation into planting areas <strong>and</strong> specify to the grading contractor to remove <strong>and</strong>store topsoil prior to rough grading, <strong>and</strong> protect it from wind <strong>and</strong> rain erosion.13.25.070 L<strong>and</strong>scape Installation Certification Package Elements.A. Signed certification. The city shall not grant a final inspection sign-off or certificateof occupancy for any project until the property owner submits a l<strong>and</strong>scape installationcertification package to the Department consistent with this section for review <strong>and</strong> approvalby the director. A licensed architect, l<strong>and</strong>scape architect, or l<strong>and</strong>scape contractor shallprepare the package. The l<strong>and</strong>scape installation certification package shall consist of asigned certification on a form approved by the director <strong>and</strong> attachments 1-5 below <strong>and</strong>attachment 6 below, if applicable. The certification shall specifically indicate that thel<strong>and</strong>scape project was installed per the l<strong>and</strong>scape design documentation package <strong>and</strong> thatthe irrigation evaluation has been performed, along with a list of any observed deficiencies,<strong>and</strong> documentation that those deficiencies have been corrected. A sample of such a form isavailable in the Department.1. An irrigation evaluation per the requirements of subsection B of this section;2. A summary of controller setting parameters per the requirements of subsectionC of this section;3. A maintenance schedule per the requirements of subsection D of this section;4. Verification of implementation of soil management recommendations meetingthe requirements of subsection 13.25.060(C) of this chapter; <strong>and</strong>5. The statement, "The l<strong>and</strong>scape project has been installed substantially inaccordance with the approved l<strong>and</strong>scape documentation package," <strong>and</strong>signature of the person preparing the certification.6. Record drawings of the irrigation system if irrigation system installationdeviated, with approval of the director, from the design submitted <strong>and</strong> approvedwith the l<strong>and</strong>scape design documentation package.B. Irrigation Evaluation. A l<strong>and</strong>scape irrigation evaluation meeting the following conditionsshall be submitted with the l<strong>and</strong>scape certification package.1. Audit or survey requirement. For newly installed irrigation systems, a l<strong>and</strong>scape irrigationsurvey, as that term is defined in 13.25.040, shall be conducted. For projects relying on a preexistingirrigation system, a l<strong>and</strong>scape irrigation audit, as that term is defined in section13.25.040 of this chapter, shall be conducted. The l<strong>and</strong>scape design plan, irrigation designplan, <strong>and</strong> irrigation schedule shall be made available to the person conducting the irrigationevaluation.2. For projects developed into multiple saleable lots, the irrigation evaluation may be limitedto a common area (e.g., project green space or park) <strong>and</strong> a representative sample of the lots.1884

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!