Supplier Requirements Manual - AK Steel
Supplier Requirements Manual - AK Steel
Supplier Requirements Manual - AK Steel
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
any of these requirements, <strong>AK</strong> <strong>Steel</strong> shall be contacted to determine the appropriate correctiveaction.Blanket statements of conformance are unacceptable for any test results. Applicable documentsmust be maintained by the <strong>Supplier</strong> regardless of submission requirements. These documents areto be made available to <strong>AK</strong> <strong>Steel</strong> upon request.Where the supply chain includes a warehouse/broker distributor, the product manufacturer maybe required to submit trial material to <strong>AK</strong> <strong>Steel</strong> for approval. Warehouse distributors are not toinitiate shipments to any <strong>AK</strong> <strong>Steel</strong> location without approval notification from <strong>AK</strong> <strong>Steel</strong>.Any questions regarding trial submission should be directed to <strong>AK</strong> <strong>Steel</strong> Purchasing.<strong>AK</strong> <strong>Steel</strong> will identify and document specific characteristics as an output of the trial process. The<strong>Supplier</strong> is required to comply with these characteristics by noting them on process controldocuments; including drawings, FMEA, control plans, and operator instructions as necessary.Appropriate packaging to protect and preserve the quality of the product is to be consideredduring this evaluation. <strong>Supplier</strong>s must use appropriate packaging, to assure that all products willarrive at <strong>AK</strong> <strong>Steel</strong> plants free of any damage and can be transported, stored and used efficiently.The packaging system should be approved by the purchasing department of the <strong>AK</strong> <strong>Steel</strong>receiving plant and specified on the purchase order (as appropriate).Note…Bulk Material <strong>Supplier</strong>s should contact <strong>AK</strong> <strong>Steel</strong> for specific requirements.<strong>AK</strong> <strong>Steel</strong> <strong>Supplier</strong> <strong>Requirements</strong> Page 13 of 55Revised 01/13