13.07.2015 Views

Supplier Requirements Manual - AK Steel

Supplier Requirements Manual - AK Steel

Supplier Requirements Manual - AK Steel

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6Chapter 6: Product/Process Changes & Deviation <strong>Requirements</strong>Product / Process Changes<strong>AK</strong> <strong>Steel</strong> must be notified promptly of any product and/or process changes by the <strong>Supplier</strong> inorder to evaluate the impact on <strong>AK</strong> <strong>Steel</strong> operating efficiencies, cost, downtime, quality andsafety.In particular, improvements/modifications that occur due to the following:Modifications that may have occurred since the original contract agreement with <strong>AK</strong> <strong>Steel</strong> forproducts/services received or will be received by <strong>AK</strong> <strong>Steel</strong>.Equipment/assemblies/products/services/parts/subassemblies/raw material <strong>Supplier</strong>s / Sub-Contracting of previously manufactured products ( i.e. workrolls) previously supplied to <strong>AK</strong><strong>Steel</strong> and although currently performing as required, have subsequently undergoneimprovements/modifications which should be communicated to <strong>AK</strong> <strong>Steel</strong> for evaluation ofthe potential impact at <strong>AK</strong> <strong>Steel</strong>.Therefore, <strong>AK</strong> <strong>Steel</strong> requires you as a <strong>Supplier</strong> to notify your appropriate <strong>AK</strong> <strong>Steel</strong> Buyer andyour <strong>AK</strong> <strong>Steel</strong> plant/operating department contact(s) of these modifications/improvements, if anyhave or will occur.Deviation <strong>Requirements</strong><strong>AK</strong> <strong>Steel</strong> requires strict adherence to a formal deviation procedure when the following situationsarise:• <strong>AK</strong> <strong>Steel</strong> production schedules require shipment of new/revised materials prior to trialapproval process or• <strong>Supplier</strong> discovers any type of non-conformance in product which is urgently needed to meetthe <strong>AK</strong> <strong>Steel</strong> production schedule.In either situation, the <strong>Supplier</strong> MUST obtain prior approval from <strong>AK</strong> <strong>Steel</strong> before makingshipments. An approved deviation is required before shipment of any product. The acceptanceof a deviation will be dependent on the nature and extent of the non-conformance and will beauthorized in writing to the <strong>Supplier</strong>. In the case where a deviation is required, the <strong>Supplier</strong> willnotify <strong>AK</strong> <strong>Steel</strong> Purchasing of the situation with detail. Purchasing will document the deviationand submit to the affected manufacturing site (Operations) for approval. When approval isreceived, <strong>AK</strong> <strong>Steel</strong> Purchasing will notify the <strong>Supplier</strong> that the deviation has been granted.The <strong>Supplier</strong> must include a copy of the approval with the shipment of product to themanufacturing site. Failure to follow this procedure may result in a product rejection and reflecton the <strong>Supplier</strong>'s quality performance.<strong>AK</strong> <strong>Steel</strong> <strong>Supplier</strong> <strong>Requirements</strong> Page 29 of 55Revised 01/13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!