13.07.2015 Views

Supplier Requirements Manual - AK Steel

Supplier Requirements Manual - AK Steel

Supplier Requirements Manual - AK Steel

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11Chapter 11: Delivery<strong>AK</strong> <strong>Steel</strong> has contracted with Pittsburgh Logistics Systems to manage its inbound freight forpurchased goods that are bought on a collect freight basis. This program applies to bothtruckload as well as less-than-truckload freight, and replaces the program previously provided byCT Logistics.When you have an item to ship to an <strong>AK</strong> <strong>Steel</strong> facility (or <strong>AK</strong>-designated consignee) that wassold to <strong>AK</strong> <strong>Steel</strong> on a collect freight basis, you will need to call Pittsburgh Logistics Systems,Inc., at (724) 709-2125 to arrange for the cargo to be picked up and delivered. This phone will beanswered on a 24/7 basis to accept new loads or to handle inquiries on existing loads.When you call this number you will need to have the following information ready: Valid <strong>AK</strong> <strong>Steel</strong> purchase order number. Cargo description, including dimensions, weight, freight class. Any special instructions that you may have regarding the cargo. Your name, phone number, and FAX number (or email address).Pittsburgh Logistics Systems will then arrange for a truck to pick up your load and deliver it to<strong>AK</strong> <strong>Steel</strong>.New purchase order paperwork created by <strong>AK</strong> <strong>Steel</strong> will also state that freight for these itemsmust be arranged through Pittsburgh Logistics Systems.If you have any questions regarding this, please feel free to contact Pittsburgh Logistics Systems,at (724) 709-2125.Delivery Performance<strong>AK</strong> <strong>Steel</strong> requires 100% On-Time delivery performance from its <strong>Supplier</strong>s. Any changes to thedelivery schedule, unless presented in writing from an <strong>AK</strong> <strong>Steel</strong> facility, are not valid.If material does not meet the delivery schedule in either quantity and/or date required as specifiedby the <strong>AK</strong> <strong>Steel</strong> manufacturing site, the <strong>Supplier</strong> will be notified of the non-conformance.If this occurs, the <strong>Supplier</strong> will be required to submit corrective action.It is the responsibility of the <strong>Supplier</strong> to make sure that all delivery notifications are accuratelyreported. These documents impact the individual <strong>Supplier</strong> performance record. If the <strong>Supplier</strong>disagrees, they must contact the issuing <strong>AK</strong> <strong>Steel</strong> site to resolve.The <strong>Supplier</strong> will be responsible for "extraordinary" costs (premium freight, etc) incurredresulting from a delivery issue.<strong>AK</strong> <strong>Steel</strong> <strong>Supplier</strong> <strong>Requirements</strong> Page 39 of 55Revised 01/13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!