13.07.2015 Views

DS397 Saf Use Mod RRs with NUSSC comments 18-06-2010

DS397 Saf Use Mod RRs with NUSSC comments 18-06-2010

DS397 Saf Use Mod RRs with NUSSC comments 18-06-2010

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

−−−−−Addressing the requirements derived from the operational limits and conditions;Providing of qualified personnel <strong>with</strong> suitable skills;Establishing appropriate operating procedures, including those for assessing andcorrecting non-conforming items;Performing and documenting the required inspections and tests, including thoserequired for commissioning;Performing and documenting the required training and instruction.2.11. The management system should include measures to control records essential to theperformance and verification of utilization and modification activities through a system fortheir identification, approval, review, filing, retrieval and disposal.2.12. Documents such as the procedures, specifications and drawings of the utilization andmodification should be prepared, reviewed, updated, approved, issued, validated, as required,and archived.2.13. Records essential to the performance and verification of modification or utilizationshould be controlled through a system for their identification, approval, review, filing,retrieval and disposal.RESOURCE MANAGEMENT2.14. The operating organization should provide adequate resources to execute themodification or utilization.– Determining the required staff competences and providing training, where appropriate,to ensure that the personnel of the operating organization are competent to performtheir assigned work;– Supervising external personnel (including suppliers) performing safety relatedactivities and ensuring that these personnel are adequately trained and qualified.2.15. Personnel who are not directly working for the research reactor facility and personnelof contracting organizations who are involved in the utilization and modification should beappropriately trained and qualified for the work they are to perform. Contractors shouldperform their activities under the same controls, and to the same work standards, as facilitypersonnel. Facility supervisors should review the work of these contractor personnel during7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!