13.07.2015 Views

DS397 Saf Use Mod RRs with NUSSC comments 18-06-2010

DS397 Saf Use Mod RRs with NUSSC comments 18-06-2010

DS397 Saf Use Mod RRs with NUSSC comments 18-06-2010

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Whatever the source of the need for a modification or an experiment, it is extremely importantthat the general concept be discussed by the reactor management and the regulatory body atan early phase of the project. It may also be appropriate to include other groups, such as thesafety committee, experimenters, equipment suppliers and independent consultants.5.7. The reasons for modifications to and experiments <strong>with</strong> research reactors may alsoarise from a variety of considerations. These considerations are discussed in Annex IIIOPERATING ORGANIZATION SAFETY DOCUMENTATION REGULATORY BODYPre-ImplementationphaseProject initiationProject definition/Project planConceptual designDesignStandards<strong>Saf</strong>ety criteriaQuality assurance<strong>Saf</strong>ety analyses<strong>Saf</strong>ety analysis reportDetailed system descriptionDiscussionsDiscussionApproval of design andConstruction approvalFabricationDesign drawingsImplementationphaseUpdating of safetydocumentationInstallationCommissioning programmeInspectionsCommissioning approvalCommissioningCommissioning reportDiscussionsPost-ImplementationphasePost-implementationsafety evaluationUpdating of safetydocumentationSurveillanceUpdated safety analysesreport and new operatinglimits and conditionsAs built/finalized documentsCompletion of trainingPreventive maintenance and sparesFinal review and project closureRoutineoperationapprovalOperation22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!