• normal operation;• special measurements or actions;• emergency situations.4.8. ShieldingDescription of shielding provisions, specifications of anticipated radiation levels in serviceareas during:• normal operation including post irradiation handling;• specific measurements;• emergency situations.5. CHARACTERISTICS 195.1. Nuclear characteristics• Specification of anticipated fluence rate values.• Description of (or reference to) measurements and/or calculations made to verify thefluence rate characteristics:a. prior to irradiation;b. during irradiation (dosimetry).• Reference to or summary of calculated and applied nuclear data.5.2. Reactivity and criticality characteristicsSpecification (based upon calculation and/or measurement) of:a. criticality aspects,b. reactivity effect of entire in-core facility in case it was removed from the core at once,<strong>with</strong> respect to a waterhole,c. reactivity effect associated <strong>with</strong> voids which can be filled <strong>with</strong> water in case of leakage,d. reactivity aspects in case of fast movement of the experimental facility5.3. Radioactivity characteristicsCalculation of total activity of radio nuclides produced in:• irradiation target (if fissionable, specify all noble gases, halogens, actinides and otherdangerous nuclides);• gases, liquids, which may escape due to containment failure;• structural parts of in-pile assembly.All calculations to be relevant for the end of the anticipated irradiation period:• calculation of the decrease in radioactivity due to decay of the major activity contributorsat end of irradiation, 10 hours, 10 days and 100 days after the end of irradiation.19 The main section of the report should mostly contain the results (tables, graphs) of the various calculations.Detailed calculations should either be reported in appendices to the safety report or in separate reports which will bereferred to in the safety analysis report of the utilization project.50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!