13.07.2015 Views

environmental assessment us border patrol, tucson sector

environmental assessment us border patrol, tucson sector

environmental assessment us border patrol, tucson sector

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12345678910111213141516171819202122232425262728293031323334353637383940the local wildlife communities, construction will only occur during daylight hours, wheneverpossible. All motor vehicles will be maintained to reduce the potential for vehicle-related noise.To minimize disturbances from helicopter <strong>us</strong>e, USBP will review landing and takeoff routes todetermine what actions could be taken, such as alternating or rotating routes, and timing the <strong>us</strong>eof different routes to reduce noise effects on wildlife or residents in the San Bernardino Valley.All helicopters will be maintained and operated to reduce the potential for engine-related noise.Solid and Hazardo<strong>us</strong> Wastes:Care will be taken to avoid impacting the project area with hazardo<strong>us</strong> substances (e.g., antifreeze,fuels, oils, lubricants) <strong>us</strong>ed during construction. Although catch pans will be <strong>us</strong>ed whenrefueling, accidental spills could occur as a result of maintenance procedures to constructionequipment. However, the amount of fuel, lubricants, and oil is limited, and equipment necessaryto quickly contain any spills will be present when refueling.Transportation:Modular buildings and other equipment will be transported on appropriate roads with properflagging and safety precautions.Findings and Concl<strong>us</strong>ions: No significant adverse impacts are anticipated for any resourceanalyzed within this document. Therefore, no further analysis or documentation (i.e.,Environmental Impact Statement) is warranted. CBP, in implementing this decision, wouldemploy all practical means to minimize the potential adverse impacts on the human andbiological environment.Project Proponent: _______________________________ ______________Efren V. M. GarciaDateDirectorFacilities BranchOffice of Border PatrolApproved: ________________________________ ______________Robert F. JansonDateActing Executive DirectorFacilities Management and EngineeringU.S. C<strong>us</strong>toms and Border ProtectionFONSI - 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!