13.07.2015 Views

Guiding principles for reserve management - NCC Environmental ...

Guiding principles for reserve management - NCC Environmental ...

Guiding principles for reserve management - NCC Environmental ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Management actions and targetsKPA 4: Infrastructure and equipment (operations)Objective 4.1: Develop and maintain the road, track and footpath network in the WNRManagement action Priority Management targets Key per<strong>for</strong>manceindicators(i) Schedule, and implement, the maintenance of the network ofState (using a grading<strong>management</strong> tracks and roads in the <strong>reserve</strong>, with a strong focus onsystem) of visitor roadsimproving the surface and drainage of highly erodible roads.and footpaths.(ii) Close and rehabilitate all unused, extraneous and/or highlyerodible <strong>management</strong> tracks and roads in the <strong>reserve</strong> (see alsoObjective 2.5 (ii)).(iii) Review the feasibility of establishing and administering acontrolled boom system across the two entry points of the publicgravel road traversing the <strong>reserve</strong> (and the subsequent removal of<strong>reserve</strong> fences along the road <strong>reserve</strong>).Rationalised networkof well-maintainedvisitor roads andfootpaths.Objective 4.2: Construct, maintain and upgrade the bulk services infrastructure in the WNRManagement action Priority Management targets Key per<strong>for</strong>manceindicators(i) Maintain (and replace as necessary) all <strong>reserve</strong> boreholes,Capacity of bulk Records of instances ofwindmills, pipes, diesel engines, electrical motors, reservoirs andservices exceeds overloading of the bulktanks supplying water to wildlife water points, staff accommodation<strong>reserve</strong> <strong>management</strong> service supplies.and the office complex.use requirements.(ii) Upgrade the sewage system <strong>for</strong> staff accommodation units, andmaintain the system of ‘French drains’ in the <strong>reserve</strong>.(iii) Ensure the regular removal of all solid waste from the <strong>reserve</strong> tothe municipal dumpsite at Rebone.(iv) Facilitate the provision of outstanding Eskom power connectionsto the administrative complex and all staff accommodation.ResponsibilityReserve ManagerReserve ManagerLEDET; Departmentof Roads andTransportResponsibilityReserve ManagerReserve ManagerReserve ManagerLEDET; RegionalManagerTime frame1 2 3 4 5Time frame1 2 3 4 5LEDET Reserve Management Documents: Wonderkop Nature Reserve (Strategic Plan) 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!