13.07.2015 Views

Guiding principles for reserve management - NCC Environmental ...

Guiding principles for reserve management - NCC Environmental ...

Guiding principles for reserve management - NCC Environmental ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.2 Funding RequirementsIt is proposed that the following operational 10 and capital 11 budget would be required to implement this SP:KEY PERFORMANCE AREAKPA 1: Biodiversity and heritageconservation2013/2014 2014/2015 2015/2016 2016/2017 2017/2018CAPEX(R)OPEX(R)CAPEX(R)OPEX(R)CAPEX(R)OPEX(R)CAPEX(R)OPEX(R)CAPEX(R)OPEX(R)1,200,000 65,000 650,000 70,000 120,000 75,000 80,000 75,000 25,000 80,000KPA 2: Sustainable use 0 15,000 0 15,000 0 15,000 0 15,000 130,000 20,000KPA 3: En<strong>for</strong>cement, security andaccess control265,000 45,000 40,000 55,000 0 60,000 0 65,000 0 65,000KPA 4: Infrastructure and equipment 650,000 60,000 520,000 70,000 460,000 85,000 200,000 95,000 240,000 105,000KPA 5: Stakeholder involvement 0 10,000 0 10,000 0 15,000 0 15,000 0 20,000KPA 6: Administration and planning 0 15,000 0 20,000 0 25,000 0 25,000 0 30,000Total 2,115,000 210,000 1,210,000 240,000 580,000 275,000 280,000 290,000 395,000 320,00010 Operational costs are roughly based on an area-complexity factor (i.e. different cost ranges per ha, based on the level (high, medium or low) of <strong>management</strong> complexity). This was then moderated against documentedexpenditure <strong>for</strong> operational costs in LEDET <strong>reserve</strong>s, wherever available. This was then again moderated against equivalent <strong>reserve</strong>s in Kwa-Zulu Natal and the Western Cape, as well as <strong>reserve</strong>s of SANParks and ECParks,where operating costs have stabilised and are well documented over a period of three to five years.11 Capital budget requirements are roughly based on known costs <strong>for</strong> similar capital investments, either in terms of replacement costs (e.g. vehicles), infrastructure development costs (e.g. cost/ha or cost/km <strong>for</strong> fencing orroads), bulk services (e.g. costs/m <strong>for</strong> pipelines, etc.), or building costs (e.g. cost/m 2 <strong>for</strong> staff accommodation or chalets), etc.LEDET Reserve Management Documents: Wonderkop Nature Reserve (Strategic Plan) 51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!