- Page 2 and 3:
For full information about procurem
- Page 4 and 5:
1.2 The supplies must comply fully
- Page 6 and 7:
5.6.3. For lot 5, the Contracting a
- Page 8 and 9:
Part 3: Documentation:To be supplie
- Page 10 and 11:
14. Clarification meeting / site vi
- Page 12 and 13:
writing, but no change in the price
- Page 14 and 15:
23.5 For the duration of the contra
- Page 16 and 17:
B. DRAFT FRAMEWORK CONTRACT AND SPE
- Page 18 and 19:
Article 3Price3.1 The price of the
- Page 20 and 21:
Article 12InsuranceThe contractor s
- Page 23 and 24:
ANNEX I: GENERAL CONDITIONSFOR SUPP
- Page 25 and 26:
communication, the sender should as
- Page 27:
OBLIGATIONS OF THE CONTRACTORArticl
- Page 30 and 31:
15.1. Subject to any provisions whi
- Page 32 and 33:
Contractor shall not be paid for th
- Page 34 and 35:
23.6. If the period of suspension e
- Page 36 and 37:
26.5. The payments shall be made as
- Page 38 and 39:
29.7. Delivery shall be deemed to h
- Page 40 and 41:
a) remedy the defect or the damage
- Page 42 and 43:
36.4. In the event of termination,
- Page 44 and 45:
The other Party shall respond to th
- Page 46 and 47:
43.1. The Contractor will allow the
- Page 48 and 49:
LOT 1: PDH/SDH Microwave EquipmentI
- Page 50 and 51:
Radio Access Card RAC30v3 QTY - 225
- Page 52 and 53:
nm 1260 to 1355 nm• Tx Average Op
- Page 54 and 55:
1617Cable IDU/ODU QTY - 30• Belde
- Page 56 and 57: • ETSI Class, R2 C3• Direct Fit
- Page 58 and 59: Element Management System QTY - 132
- Page 60 and 61: • 250kHz channel size• Integrat
- Page 62 and 63: Cable Feeder Quantity 200 meters9
- Page 64 and 65: Emergency Power System (EPS) QTY -
- Page 66 and 67: LOT 5 - Telecommunications Towers.I
- Page 68 and 69: Land and Rights to Ingress and Egre
- Page 70 and 71: • The contractor will earth each
- Page 72 and 73: Tower Foundation Design _Class BQTY
- Page 74 and 75: loading will be in accordance with
- Page 76 and 77: adequate in surface area and streng
- Page 78 and 79: contractors quality assurance progr
- Page 80 and 81: ANNEX IV: Budget breakdown (Model f
- Page 82 and 83: 22 30023 424 2525 5026 1027 428 202
- Page 84 and 85: 6 67 68 69 200 meters10 211 1012 20
- Page 86 and 87: ANNEX IV: Budget breakdown (Model f
- Page 88 and 89: 6 37 48 3TOTAL88
- Page 90 and 91: ANNEX V: MODEL PERFORMANCE GUARANTE
- Page 92 and 93: ADMINISTRATIVE COMPLIANCE GRIDContr
- Page 94 and 95: D. TENDER FORM FOR A SUPPLY CONTRAC
- Page 96 and 97: Net cash from / (used in) operating
- Page 98 and 99: 5 FIELDS OF SPECIALISATIONPlease us
- Page 100 and 101: 7 TENDERER'S DECLARATION(S)As part
- Page 102 and 103: If this declaration is being comple
- Page 104 and 105: C. GLOSSARYAdministrative order: An