13.07.2015 Views

Tender Dossier - Eulex

Tender Dossier - Eulex

Tender Dossier - Eulex

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ANNEX II + III : TECHNICAL SPECIFICATIONS + TECHNICAL OFFERContract title: Supply of: “Microwave Equipment and Telecommunications Towers”. p 1 /…Publication reference: EuropeAid/128790/D/SUP/KOSColumn 1-2 should be completed by the Contracting AuthorityColumn 3-4 should be completed by the tendererColumn 5 is reserved for the evaluation committeeAnnex III - the Contractor's technical offerThe tenderers are requested to complete the template on the next pages:• Column 2 is completed by the Contracting Authority shows the required specifications (not to be modified by the tenderer),• Column 3 is to be filled in by the tenderer and must detail what is offered (for example the words “compliant” or “yes” are not sufficient)• Column 4 allows the tenderer to make comments on its proposed supply and to make eventual references to the documentationThe eventual documentation supplied should clearly indicate (highlight, mark) the models offered and the options included, if any, so that theevaluators can see the exact configuration. Offers that do not permit to identify precisely the models and the specifications may be rejected by theevaluation committee.The offer must be clear enough to allow the evaluators to make an easy comparison between the requested specifications and the offeredspecifications.Clarification about possible/maximum quantities that MAY be requested as part of the first purchase order.• For lots 1 and 2 and 3 and 4: the Contracting Authority MAY issue a first purchase order with significant quantities for theitems that are part of these lots. This first purchase order MAY represent 80% (or more) of the yearly estimated quantities forthese lots.• For lot 5, the Contracting authority will produce a project timeline for delivery and construction of the telecommunicationstowers, based on the installation of maximum one telecommunication tower per week.47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!