13.07.2015 Views

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Amendment 0005Red Bluff Pumping Plant and Fish Screen Specifications No. 20-C0752be deemed to relieve the Contractor of primary responsibility for protectingGovernment-furnished productsN. Return unused Government-furnished products to the Government at points convenient tothe work, as directed.1.04 ACCEPTANCE AT <strong>SITE</strong>A. Unload, uncrate, assemble, install, connect, and test products.1. Uncrate new products in the presence of the COTR to inspect for damaged ormissing parts.2. Schedule a joint inspection of products with the COTR to determine existingcondition.3. The Contractor shall be responsible for damage sustained by products after thisinspection.B. After joint inspection, recrate or repackage products.C. Report to the CO in writing, within 24 hours after unloading, any shortage in or damageto products when delivered.<strong>PART</strong> 2PRODUCTS2.<strong>01</strong> PRODUCTSA. The Government will furnish products listed in Table <strong>01</strong> 64 40A -Government-Furnished Products.ItemNo.Table <strong>01</strong> 64 40A - Government-Furnished ProductsDescriptionEstimatedquantityEstimateddeliverydateEstimatedcost1 Vertical Axial-Flow Pumps –nominal 125 cfs2 Vertical Axial-Flow Pumps –nominal 250 cfs3 300-Horsepower Vertical InductionMotors4 600-Horsepower Vertical InductionMotors2 pumps April, 2<strong>01</strong>1 $771,7767 pumps April, 2<strong>01</strong>1 $3,768,6182 motors April, 2<strong>01</strong>1 $418,0707 motors April, 2<strong>01</strong>1 $7,860,320Government-Furnished Products<strong>01</strong> 64 40 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!