13.07.2015 Views

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Amendment 0005Red Bluff Pumping Plant and Fish Screen Specifications No. 20-C07522. Construct at approved location to prevent water from entering work area duringconstruction.3. Coordinate location of cofferdam bracing with pier wall top slab construction.4. Maintain cofferdam until removal is directed by COTR.C. Monitoring:1. Monitor and submit river stage, cofferdam deflection, leakage and underseepagedata in accordance with the approved plan.2. Daily leakage shall be measured separately through interlocks and coming up intobottom of excavation. Leakage measurements shall be for each 300 feet ofcofferdam length.3. Cofferdam design engineer shall review monitoring data, perform monthlycofferdam inspection, and submit a monthly inspection report to identify the needfor maintenance, repairs or changes in operations.4. Cooperate with monitoring and inspection of marine work by permit agencyrepresentatives.5. When monitoring by the Contractor, or other conditions disclose inadequatecofferdam system performance, the Contractor shall supplement, revise, orchange the system as required to comply with these specifications.D. Repairs:1. Repair damage to the work resulting from all causes including negligence,improper installation or maintenance of cofferdam.2. Repair damage to existing structures, channels, roads, and other features causedby failure to maintain cofferdam.3. Perform repairs at no expense to Government.E. Removal of Cofferdam:1. Remove cofferdam after obtaining approval of the COTR. Cut sheet piles atelevations shown. Where sheet piles are shown to be left in place remove sharpedges and create smooth transitions.2. Dispose of earth materials in accordance with Section 31 23 90 - Disposal ofExcavated Materials.3. Remove non-earth materials from worksite.4. Repair damage to concrete or other permanent structures in accordance withUSBR M-47.a. Use repair or replacement method directed by the COTR.Removing and Controlling Water During Construction31 03 33 - 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!