13.07.2015 Views

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Amendment 0005Red Bluff Pumping Plant and Fish Screen Specifications No. 20-C0752registered in the State of California. Include personnel list, schedules,equipment, reporting, system supplementation or revision, and otheroperations related to diversion and care of water.4. Design drawings, calculations, data, and other supporting design documents shallbe stamped by a Professional Engineer registered in the State of California.Monthly report of cofferdam inspection and review of monitoring data shall bestamped by same Professional Engineer who stamped the design.5. The plan may be placed in operation upon approval, but nothing in this Sectionshall relieve the Contractor from full responsibility for the adequacy of thecofferdam installation.D. RSN 31 03 33-3, Records:1. Cofferdam performance monitoring data and stamped monthly inspection reportsby cofferdam design engineer.2. Monitoring records required by permits.E. RSN 31 03 33-4, Bathometric Surveys of River:1. Topographic map with 1 foot contour intervals extending from face of fish screencofferdam location and for a distance of 200 feet upstream and downstream of thefish screen cofferdam and out into the Sacramento River a distance of 20 feetfrom the shoreline or from the face of the cofferdam, whichever is greater.2. Bathometric contours to be tied to contours above shoreline shown on the projecttopographic map.3. Provide electronic files of topographic map.4. Provide updated bathometric surveys of scour repair areas as specified.1.05 SYSTEM DESCRIPTION AND <strong>GENERAL</strong> REQUIREMENTSA. Design, furnish, install, maintain, operate, monitor, and remove facilities required fordiversion and care of the Sacramento River, removal of water during requiredexcavations and construction of facilities, and for controlled flooding of cofferdams,excavations, and structures below groundwater or the Sacramento River if necessary toprotect facilities from damage due to instability, uplift or excessive deflection.B. Comply with RSHS.C. Dewatering and unwatering operations are dependent on the construction methods usedand the sequence of excavation and construction operations used for work completion.D. Dewatering and unwatering requirements can be divided into two basic categories:1. Excavation and construction in the wet is where water is present in the area beingexcavated. The source of the water may be groundwater or seepage throughshoring or cofferdams. This applies to the forebay and fish screen area onlyRemoving and Controlling Water During Construction31 03 33 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!