13.07.2015 Views

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Amendment 0005Red Bluff Pumping Plant and Fish Screen Specifications No. 20-C0752of Contact Water in accordance with all applicable laws, rules,and regulations.F. Monthly progress payments for Removal and Control of Water… CLINs and ContactWater Management CLIN above will be based on approved cost allocations to the majorwork divisions and the percentage of each major division of work performed.G. Cost:1. Include cost of collection, storage, testing, transportation, and treatment of contactwater or leachate at stockpile in the price offered in Schedule B for StockpileConstruction, Management, Removal, and Disposal.1.02 REFERENCE STANDARDSA. Bureau of Reclamation (USBR)1. RSHS-2009 Reclamation Safety and Health Standards2. USBR M-47 Standard Specifications for Repair of Concrete,August 19961.03 DEFINITIONSA. Unwatering: Removal and control of ponded or flowing surface water, diversion ofsurface water courses, including surface seepage and precipitation, from within andadjacent to excavations.B. Dewatering: Removal and control of groundwater and removal of water from pores orother open spaces in soil or rock formations to allow construction activities to proceed asintended, and includes relief of groundwater pressure.C. Contact Water: Any water that accumulates on the Project Site that has been in contactwith the landfill waste.1.04 SUBMITTALSA. Submit the following in accordance with Section <strong>01</strong> 33 00 - Submittals.B. RSN 31 03 33-1, Removal of Water Plan:1. Show proposed methods and equipment to be used for achieving and maintainingconstruction areas in a dewatered and unwatered hydrostatically relievedcondition for excavations and foundation activities to occur. All facilitiesrequiring dewatering or unwatering shall be included. Show proposed methodsand equipment to be used for excavations and foundation activities. Include:a. Experience for dewatering systems designer, installer, and operator.Include brief descriptions for each of at least two previous successfulprojects of complexity comparable to that required for this contract.Removing and Controlling Water During Construction31 03 33 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!