13.07.2015 Views

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Amendment 0005Red Bluff Pumping Plant and Fish Screen Specifications No. 20-C0752b. Layout, description, equipment, and materials for dewatering andunwatering systems.c. Height of cofferdams and assumed recurrence interval for overtopping byriver.d. Dewatering and unwatering methods and equipment.e. Locations, depths, layout, and sizes for well points, deep wells,monitoring wells, discharge headers and disposal lines, disposal areas andfacilities, sumps, drains, ditches, and other dewatering system features.f. Types, sizes, quantities, capacities, and other identifying characteristicsfor pumps, discharge and conveyance piping, standby equipment, powersystems, well screens, filter materials, monitoring equipment, and otherdewatering system components.g. Methods and procedures for installation (include sterilization if requiredby State or local statute), testing, operation, maintenance, monitoring, andremoval of dewatering systems. Include personnel list, schedules, drillingmethods, well development techniques, interruption prevention andcorrection, system supplementation or revision, and other operationsrelated to dewatering.h. Design calculations and supporting data upon which each dewateringsystem to be used is based. Include a description and profile of thegeology, soil, groundwater conditions, stream/surface water conditions,and other pertinent characteristics at each site.i. Plan, procedure, location, and details for disposal of flows fromdewatering systems.j. Compliance with Water Pollution Control treatment and discharge permitsrequired by California Regional Water Quality Control Board.k. Final removal methods upon completion.l. Design drawings, calculations, data, and other documents shall be stampedby a Professional Engineer registered in the State of California.2. For payment purposes, prepare the plan with not less than 3 major divisions, onefor each part of the project, including as a minimum the following:a. Fish screen.b. Pumping plant.c. Forebay, retaining walls, canal and other site work.3. The plan may be placed in operation upon approval, but nothing in this Sectionshall relieve the Contractor from full responsibility for the adequacy of the watercontrol installation.C. RSN 31 03 33-2, Cofferdam Plan for Sacramento River:Removing and Controlling Water During Construction31 03 33 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!