13.07.2015 Views

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SECTION 01 14 10 USE OF SITE PART 1 GENERAL ... - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Amendment 0005Red Bluff Pumping Plant and Fish Screen Specifications No. 20-C0752L. Solid waste: Individual pieces of waste that includes tires, concrete, metal, wood debris,and other miscellaneous items.1.04 SUBMITTALSA. Submit the following in accordance with Section <strong>01</strong> 33 00 - Submittals.B. RSN 02 61 <strong>01</strong>-1, Approval data:1. Permits and certification for soil, debris, and waste haulers.2. Permits, certification, and acceptance requirements for proposed soil, debris, andwastewater disposal or treatment facilities.3. Qualifications:a. Contractor documentation of experience.b. Contractor’s Personnel: Documentation personnel proposed for Work withcontaminated materials have been 40 hour trained in accordance with 29CFR 19<strong>10</strong>.120.c. Licensed Site Professional’s documentation of experience and registration.d. Waste Transporter: Documentation of licensing and equipmentcapabilities.e. Offsite Disposal and Treatment Facilities: Documentation of licensing,disposal requirements, and acceptance of the waste.4. Inspection reports, including photographs, and other items requested by COR.5. Emergency Response Plan: Details how to handle an emergency during executionof the Work (for example, encountering drums with unknown contents;encountering pockets of hazardous atmospheres; response to spills caused byexcavation of materials by Contractor or Contractor’s equipment; response to fireor injured personnel).C. RSN 02 61 <strong>01</strong>-2, Waste Manifests:1. Copies of manifests or bills of lading, and waste disposal or treatment facilityreceipts, including weight tickets, for waste materials, solid or liquid, removedfrom Site and transported to disposal facilities.2. Waste manifests will be signed by COTR.D. Reporting requirements:1. During excavation and removal activities submit the following to OGR:a. Daily job progress log detailing information on the review of progresswith respect to previously established milestones and schedules, majorproblems, corrective actions, injury reports, equipment breakdown, andsampling results.b. Weekly excavation plans.Removal and Disposal of Excavated Material From Landfill02 61 <strong>01</strong> - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!