5.7.2 Potential ImpactsThe works for the Feeder 708 upgrade will be restricted <strong>to</strong> pole excavations and polemodifications and as a result will not significantly impact on the existing visual amenity orsignificance of the heritage listed railway station. The proposal passes through Bexley North<strong>Rail</strong>way Station curtilage and work will be undertaken near brick piers that are of localheritage significance, but the works involve the replacement of three poles and overheadwires. Therefore negligible impacts on the station are expected.Bexley North <strong>Rail</strong>way Station was identified as a <strong>Rail</strong>Corp section 170 listing and as such stateheritage approval for the work is not required. However Sydney Trains have been consultedand its proposed mitigation measures have been incorporated.Wolli Creek Valley was listed on the Rockdale LEP and it runs from Bexley Road east of theproposal along Wolli Creek, adjacent <strong>to</strong> the proposed feeder route. The works involvereplacing the existing infrastructure, therefore there is not expected <strong>to</strong> be any additionalvisual impacts. As such, Wolli Creek Valley is not expected <strong>to</strong> be impacted by the proposal.5.7.3 Control MeasuresEnsure there are adequate safeguards <strong>to</strong> protect the heritage components of the BexleyNorth <strong>Rail</strong>way Station, including the brick piers supporting the overbridge.Rockdale City Council will be consulted in relation <strong>to</strong> the Wolli Creek Valley prior <strong>to</strong> anyconstruction works.Both the Bexley North <strong>Rail</strong>way Station Group and Wolli Creek Valley heritage items will beidentified in the CEMP and ECM <strong>to</strong> ensure workers are aware of their locations. If there arescope changes that may impact on the item <strong>to</strong> contact the environmental representativeand the Office of <strong>Rail</strong> Heritage is <strong>to</strong> be consulted.If any item suspected of being of non-indigenous heritage significance is found, work is <strong>to</strong>cease in the area until the item can be verified by a heritage consultant, be reported <strong>to</strong> theOffice of Environment and Heritage and the relevant approvals sought.Any accidental damage <strong>to</strong> heritage items during the construction phase will be immediatelyreported <strong>to</strong> the environmental representative (ER) and <strong>to</strong> TfNSW.5.8 Waste5.8.1 Waste Management StrategiesThe hierarchy of waste management that will be adopted for this proposal;Prevention of wastage of materials on site.Minimise the amount of waste generated.Reuse materials where possible.Recycle materials where possible.Disposal of waste in a responsible manner.Novo <strong>Rail</strong> adopts the resource management hierarchy principles embodied in the WasteAvoidance and Resource Recovery Act 2001. Reporting of waste under the Waste Reductionand Purchasing Policy (WRAPP) will be undertaken.Page 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!