13.07.2015 Views

Building construction and townships - Environmental Clearance

Building construction and townships - Environmental Clearance

Building construction and townships - Environmental Clearance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA Guidance Manual – <strong>Building</strong>, Construction, Townships <strong>and</strong> Area Developmentopportunities, <strong>and</strong> building envelope <strong>and</strong> system choices, as well as economic guidelines <strong>and</strong>occupant activities, are all factors that need to be considered in an integrated approach.Application of new building concepts can yield for savings during the <strong>construction</strong> process.Measures that are relatively easy to implement can result in savings to natural resources in thefollowing areas:Lower energy costs, by monitoring usage, installing energy-efficient lamps <strong>and</strong> fixtures,<strong>and</strong> using occupancy sensors to control lighting fixtures;Lower water costs, by monitoring consumption <strong>and</strong> reusing stormwater <strong>and</strong>/or<strong>construction</strong> wastewater where possible;Lower site-clearing costs, by minimizing site disruption <strong>and</strong> movement of earth <strong>and</strong>installation of artificial systems;Lower l<strong>and</strong>fill dumping fees <strong>and</strong> associated hauling charges, through reuse <strong>and</strong>recycling of <strong>construction</strong> <strong>and</strong> demolition debris;Lower materials costs, with more careful purchase <strong>and</strong> reuse of resources <strong>and</strong>materials;Possible earnings from sales of reusable items removed during building demolition;<strong>and</strong>1.2 <strong>Environmental</strong> <strong>Clearance</strong> ProcessThe objective of the EIA Notification, 2006 is to set procedures of environmental clearance beforeestablishment of identified nature <strong>and</strong> size. The suitability of site for a proposed developmentis one of primary concerns in according environmental clearance to a project.The applicant will have to furnish, along with the application, in addition to Form 1 <strong>and</strong> thesupplementary Form 1A, a copy of the conceptual plan. The details of the categories mentionedin the given schedule are as follows:Project or ActivityCategorywiththreshold limit- B CategoryGeneral Conditions8. <strong>Building</strong> /Construction projects/Area Development projects <strong>and</strong> Townships8(a) <strong>Building</strong> <strong>and</strong> >20000 sq.mtrs <strong>and</strong> "Any project or activity specifiedConstruction projects

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!