Building construction and townships - Environmental Clearance
Building construction and townships - Environmental Clearance
Building construction and townships - Environmental Clearance
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
EIA Guidance Manual – <strong>Building</strong>, Construction, Townships <strong>and</strong> Area Developmentopportunities, <strong>and</strong> building envelope <strong>and</strong> system choices, as well as economic guidelines <strong>and</strong>occupant activities, are all factors that need to be considered in an integrated approach.Application of new building concepts can yield for savings during the <strong>construction</strong> process.Measures that are relatively easy to implement can result in savings to natural resources in thefollowing areas:Lower energy costs, by monitoring usage, installing energy-efficient lamps <strong>and</strong> fixtures,<strong>and</strong> using occupancy sensors to control lighting fixtures;Lower water costs, by monitoring consumption <strong>and</strong> reusing stormwater <strong>and</strong>/or<strong>construction</strong> wastewater where possible;Lower site-clearing costs, by minimizing site disruption <strong>and</strong> movement of earth <strong>and</strong>installation of artificial systems;Lower l<strong>and</strong>fill dumping fees <strong>and</strong> associated hauling charges, through reuse <strong>and</strong>recycling of <strong>construction</strong> <strong>and</strong> demolition debris;Lower materials costs, with more careful purchase <strong>and</strong> reuse of resources <strong>and</strong>materials;Possible earnings from sales of reusable items removed during building demolition;<strong>and</strong>1.2 <strong>Environmental</strong> <strong>Clearance</strong> ProcessThe objective of the EIA Notification, 2006 is to set procedures of environmental clearance beforeestablishment of identified nature <strong>and</strong> size. The suitability of site for a proposed developmentis one of primary concerns in according environmental clearance to a project.The applicant will have to furnish, along with the application, in addition to Form 1 <strong>and</strong> thesupplementary Form 1A, a copy of the conceptual plan. The details of the categories mentionedin the given schedule are as follows:Project or ActivityCategorywiththreshold limit- B CategoryGeneral Conditions8. <strong>Building</strong> /Construction projects/Area Development projects <strong>and</strong> Townships8(a) <strong>Building</strong> <strong>and</strong> >20000 sq.mtrs <strong>and</strong> "Any project or activity specifiedConstruction projects