Building construction and townships - Environmental Clearance
Building construction and townships - Environmental Clearance
Building construction and townships - Environmental Clearance
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Anticipated Impacts <strong>and</strong> Mitigation Measures Comply with the safety procedures, norms <strong>and</strong> guidelines (as applicable) as outlinedin the document Part 7 _Constructional practices <strong>and</strong> safety, 2005, National <strong>Building</strong>code of India, Bureau of Indian St<strong>and</strong>ardsProvide clean drinking water to all workersProvide adequate number of decentralized latrines <strong>and</strong> urinals to <strong>construction</strong> workers.Guarding all parts of dangerous machinery.Precautions for working on machinery.Maintaining hoists <strong>and</strong> lifts, lifting machines, chains, ropes, <strong>and</strong> other lifting tacklesin good condition.Durable <strong>and</strong> reusable formwork systems to replace timber formwork <strong>and</strong> ensure thatformwork where used is properly maintained.Ensuring that walking surfaces or boards at height are of sound <strong>construction</strong> <strong>and</strong> areprovided with safety rails or belts.Provide protective equipment; helmets etc.Provide measures to prevent fires. Fire extinguishers <strong>and</strong> buckets of s<strong>and</strong> to be providedin the fire-prone area <strong>and</strong> elsewhere.Provide sufficient <strong>and</strong> suitable light for working during night time.Dangers, health hazards, <strong>and</strong> measures to protect workers from materials of<strong>construction</strong>, transportation, storage etc.Safety policies of the <strong>construction</strong> firm/division/company.44.7Solid WasteThe <strong>construction</strong> phase waste will comprise of excavated <strong>and</strong> demolition material whileoperational phase waste may comprise of domestic, commercial <strong>and</strong> biomedical wastes,depending upon the type of the project. The different types of wastes need to be h<strong>and</strong>led as pertheir needs <strong>and</strong> regulatory requirements. It is not possible to dispose off all type of wastes ontothe l<strong>and</strong> <strong>and</strong> has to be dealt with depending upon their type <strong>and</strong> characteristics. <strong>Building</strong><strong>construction</strong> leads to generation of s<strong>and</strong>, gravel, concrete, stone, bricks, wood, metal, glass,polythene sheets plastic, paper etc. as waste.Type of wastes, which are generated, can be classified into four categories.1. Construction or demolition waste, i.e., massive <strong>and</strong> inert waste2. Municipal waste, i.e., biodegradable <strong>and</strong> recyclable waste3. Hazardous waste,4. E-wasteThe waste characterization in <strong>construction</strong>al stage should be estimated by reviewing other similaralready existing projects <strong>and</strong> given in tabular form. Similarly wastes generated in operationalphase should be estimated <strong>and</strong> classified asAdministrative Staff College of India, Hyderabad23