13.07.2015 Views

INFOBALE - Hjallerup Maskinforretning A/S

INFOBALE - Hjallerup Maskinforretning A/S

INFOBALE - Hjallerup Maskinforretning A/S

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EN5) Electric emergency control densitypressureIn the event of an electronic problem, the<strong>INFOBALE</strong> control system still offers a possibility tocontrol the density pressure.Put the main switch under the control box inposition (II). The density pressure can be increasedwith the emergency switch on the sideuntil the required setting has been reached on thepressure gauge. Repeat this procedure regularly(every 30 sec, depending on frequency of readingthe manometre). Now the operator can read thedesired pressure from the pressure gauge. Themaximum density pressure is set by rotating thehandwheel of the proportional valve on thehydraulic valve block (V5)! This procedure mustNEVER be performed during work!Caution: The emergency density pressure controlmakes it possible to continue work despiteelectronic problems. It remains important to remedythe problem quickly. Quick and proper baleroperation requires that the machine runs with the<strong>INFOBALE</strong> control system with the main switch inposition (I).© Kverneland11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!