22.08.2015 Views

Seawater Desalination Code

Seawater Desalination Code

Seawater Desalination Code

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CC.4.2.3 The locations of Interface Point I and II are as set out in ‎CC-Appendix 3and ‎CC-Appendix 4.CC.4.3CC.4.3.1Connection Point EquipmentThe Connection Point Equipment shall be procured, installed,commissioned and tested by each User applying for connection, except forthe shut-off valve which connects the Connection Point to the DWTS,which shall be procured, installed, commissioned and tested by the DWTSO.CC.4.3.2 The standard Connection Point configurations are shown in ‎CC-Appendix 3and ‎CC-Appendix 4.CC.4.4CC.4.4.1CC.4.4.2CC.4.5CC.4.5.1CC.4.5.2CC.4.5.3CC.4.6CC.4.6.1CC.4.6.2CC.4.6.3CC.4.7CC.4.7.1CC.4.8CC.4.8.1Equipment numbering system for the Connection PointsEach User’s Connection Point Equipment must be labeled by such User inaccordance with the equipment numbering system guidelines stipulated bythe DWTSO.The DWTSO shall be responsible for establishing the equipment numberingsystem guidelines, and notifying each User of such guidelines.Operational DiagramAn Operational Diagram will at all times be maintained by each User,covering the Connection Point Equipment, and any part of the Facilityadjacent to the Connection Point which may directly affect the ability of theDWTSO or each User to operate or maintain or otherwise have access to theConnection Point.The DWTSO shall provide to each User, information relating to the DWTSrequired by each User to prepare the Operational Diagram, prior to eachUser applying to connect its Facility to the DWTS.Each User shall then provide the Operational Diagram of its proposed newConnection Point to the DWTSO for review and approval by the DWTSO.Water Metering SystemThe Water Metering System shall be designed and installed by each User inaccordance with the requirements set out in ‎CC-Appendix 5.Each User and the DWTSO shall take all reasonable steps to ensure thateach Water Metering System is located as close as reasonably practicable tothe Connection Point.Each Water Meter included within the Water Metering System at eachConnection Point shall be independently operated by the DWTSO and eachUser, as the case may be.Online Monitoring SystemThe Online Monitoring System shall be designed and installed by eachUser in accordance with the requirements set out in ‎CC-Appendix 6.Shut-off ValveThe shut-off valve connected to the DWTS and each Facility, as the casemay be, shall be of a flanged type and must be in compliance with allrelevant standards of:(a)(b)the Saudi Arabian Standards Organisation;ASME;7561A01/FICHT-7235220-v22CC-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!