22.08.2015 Views

Seawater Desalination Code

Seawater Desalination Code

Seawater Desalination Code

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPERATION CODE 1:O P E R A T I O N A L P L A N N I N GOC1.1OC1.1.1OC1.1.2INTRODUCTIONThis Operation <strong>Code</strong> 1 - Operational Planning addresses the preparationby the DWTSO of the One (1) Year Operating Plan (OYOP) and theThree (3) Year Operating Plan (TYOP).In order for the DWTSO to prepare the OYOP and the TYOP, each Usershall provide the forecast data and maintenance scheduling information asfollows:(a)(b)(c)each WDSO shall provide to the DWTSO its Transmitted Waterdemand forecast data;each Water Producer shall provide to the DWTSO its DesalinatedWater or Water, as the case may, production forecast data; andeach Water Producer and each WDSO shall provide to the DWTSOits maintenance schedule in relation to its Facility.OC1.2OC1.2.1OBJECTIVEThe objectives of this Operation <strong>Code</strong> 1 - Operational Planning is toprovide for the:(a)(b)(c)preparation by the DWTSO of the OYOP and the TYOP;distribution by the DWTSO of the OYOP and the TYOP to eachUser; andnotification by the DWTSO to ECRA and MOWE of any issues ofconcern raised in the OYOP or the TYOP.OC1.3OC1.3.1SCOPEThis Operation <strong>Code</strong> 1 - Operational Planning applies to the DWTSO andto the following Users:(a)(b)Water Producers; andWDSOs.OC1.4OC1.4.1OC1.4.2OC1.4.2.1ONE (1) YEAR OPERATING PLANThe OYOP shall be prepared annually by the DWTSO.WDSO demand forecast dataBy the end of March each Year, each WDSO shall provide to the DWTSO,in relation to each of its Connection Points, its best estimate of theinformation listed below, for each Day of the following Year:7561A01/FICHT-7235220-v22OC-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!