10-Years and $500 Million towards Managing the Floodplain in Flash Flood Alley

1-TFMA_Program-Presentation

1-TFMA_Program-Presentation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Performance on 4/29/2013: Up to a 25-Year (4%) Storm<br />

46<br />

Ingram Road LWC<br />

($9.9 M Total Cost)<br />

• Unimproved Ingram Road low<br />

water cross<strong>in</strong>g would have<br />

overtopped by 2.5 to 3 feet<br />

dur<strong>in</strong>g <strong>the</strong> April 29th Storm<br />

(W Commerce/P<strong>in</strong>n Rds<br />

downstream closed)<br />

• New Ingram Road Bridge<br />

provided safe passage dur<strong>in</strong>g<br />

<strong>the</strong> April 29th Storm