Performance on May 25, 2013:<br />

Up to a 250-Year (0.4%) Storm<br />

San Antonio River Watershed ($161.9 M Total Budgeted)<br />

San Antonio River Watershed was <strong>the</strong> hardest hit.<br />

Improvements <strong>in</strong> this watershed <strong>in</strong>clude:<br />

23 projects:<br />

• 18 low water cross<strong>in</strong>gs<br />

improvements<br />

• 2.9 miles of storm sewer<br />

<strong>in</strong>stallation<br />

• 3.7 miles of channels<br />

improvements<br />

• 3 dam rehabilitations<br />

• 1 detention facility<br />

93% of <strong>the</strong> budget of <strong>the</strong> SA River projects is <strong>in</strong>side <strong>the</strong> city limits