26.08.2015 Views

10-Years and $500 Million towards Managing the Floodplain in Flash Flood Alley

1-TFMA_Program-Presentation

1-TFMA_Program-Presentation

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Performance on May 25, 2013:<br />

Up to a 250-Year (0.4%) Storm – Barbara Dr<br />

Dra<strong>in</strong>age <strong>Alley</strong><br />

Barbara Drive<br />

McCullough Ave<br />

Exist<strong>in</strong>g Dra<strong>in</strong>age Easements Varies from 50 to 65<br />

feet Requir<strong>in</strong>g:<br />

• 16 foot temporary construction <strong>and</strong> utility<br />

easements from 22 properties<br />

• Major construction <strong>in</strong> <strong>the</strong> backyard of residents<br />

homes <strong>in</strong>volv<strong>in</strong>g excavation, <strong>in</strong>stallation of concrete<br />

boxes, & utility relocation<br />

• Impacts to fences, sheds, detached garages,<br />

playscapes, etc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!