Performance on 4/29/2013: Up to a 25-Year (4%) Storm<br />
Galm Road Phase I & II<br />
49<br />
$12 M Total Budget, $2 M <strong>Flood</strong> Control<br />
Proposed road elevation will be <strong>10</strong>-ft higher than exist<strong>in</strong>g.<br />
Currently concrete columns 8-ft higher than exist<strong>in</strong>g.<br />
9 people were rescued from 6 different<br />
vehicles trapped <strong>in</strong> <strong>the</strong> 11500 block of<br />
Galm Road <strong>in</strong> flooded waters