10-Years and $500 Million towards Managing the Floodplain in Flash Flood Alley
1-TFMA_Program-Presentation
1-TFMA_Program-Presentation
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Performance on May 25, 2013:<br />
Up to a 250-Year (0.4%) Storm<br />
Laddie Place Phase III ($28 M Total Cost)<br />
Benefits of Project:<br />
• Removes approximately<br />
74 homes from <strong>the</strong> floodpla<strong>in</strong><br />
• Reduces flood<strong>in</strong>g<br />
• Establishes new usable<br />
green space, enhanc<strong>in</strong>g <strong>the</strong><br />
community’s quality of life<br />
Before<br />
May 25 th <strong>Flood</strong><strong>in</strong>g<br />
Future