Performance on May 25, 2013:<br />

Up to a 250-Year (0.4%) Storm<br />

Laddie Place Phase III ($28 M Total Cost)<br />

Benefits of Project:<br />

• Removes approximately<br />

74 homes from <strong>the</strong> floodpla<strong>in</strong><br />

• Reduces flood<strong>in</strong>g<br />

• Establishes new usable<br />

green space, enhanc<strong>in</strong>g <strong>the</strong><br />

community’s quality of life<br />

Before<br />

May 25 th <strong>Flood</strong><strong>in</strong>g<br />

Future