Performance on May 25, 2013:<br />

Up to a 250-Year (0.4%) Storm<br />

Olmos Dam ($6.3 M Total Cost)<br />

• Structural <strong>in</strong>tegrity re<strong>in</strong>forced<br />

• Installed 68 cable tendons<br />

• Protects <strong>10</strong>,909 properties with a value of $3.2 Billion<br />

2013: 36.7 Feet<br />

2002: 40 Feet<br />

1998: 36 Feet<br />