10-Years and $500 Million towards Managing the Floodplain in Flash Flood Alley
1-TFMA_Program-Presentation
1-TFMA_Program-Presentation
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Performance on May 25, 2013:<br />
Up to a 250-Year (0.4%) Storm<br />
Evans Road LWC ($3.9 M Total Cost)<br />
<strong>Flood</strong><strong>in</strong>g dur<strong>in</strong>g Construction<br />
<strong>Flood</strong><strong>in</strong>g before Construction<br />
Completed Bridge