Performance on May 25, 2013:<br />
Up to a 250-Year (0.4%) Storm<br />
Barbara Drive (SA-3)<br />
• Provide unflooded access <strong>and</strong> reduce flood<strong>in</strong>g<br />
• Prelim<strong>in</strong>ary Phase Study completed Nov 2012<br />
• Construction costs escalated from $8.5 M to $13.4 M.<br />