Performance on 4/29/2013: Up to a 25-Year (4%) Storm<br />

50<br />

ID Project Name Pct. OCL/ICL Status Total Budget<br />

LC8 Ingram Road Low Water Cross<strong>in</strong>g 2 ICL Completed $ 9,900,000<br />

N/A Galm Road Phase I (Program Fund<strong>in</strong>g Only) 2 OCL Under Construction $ 2,000,000<br />

CW1 High Water Detection System Phase II (Costs for NW Sites) CW OCL/ICL Under Construction $ 420,000<br />

LC17B Huebner Creek Enhanced Conveyance NWWC Segment II 2 ICL Advertis<strong>in</strong>g $ 15,600,000<br />

LC18 Boerne Stage Road (Program Fund<strong>in</strong>g Only) 3 OCL Detailed Design $ <strong>10</strong>,700,000<br />

LC27 Old Fredricksburg Road 3 OCL Detailed Design $ 2,<strong>10</strong>0,000<br />

LC9 Hausman Dra<strong>in</strong>age Project Phase I 3 ICL Detailed Design $ 13,<strong>10</strong>0,000<br />

LC19 Local Project -Whisper Creek at Hollyhock 3 ICL Detailed Design $ 2,800,000<br />

LC15 Huebner Creek RSWF at Prue Road 3 ICL Detailed Design $ 3,500,000<br />

LC17C Huebner Creek Enhanced Conveyance NWWC Segment III 2 ICL (Leon Valley) Detailed Design $ 23,<strong>10</strong>0,000<br />

LC23 French Creek Trib NWWC –Environmental 3 ICL (Helotes) Negotiation/Detailed $ 5,<strong>10</strong>0,000<br />

LC<strong>10</strong> Hausman Dra<strong>in</strong>age Project Phase II 3 ICL Prelim<strong>in</strong>ary Design $ 8,700,000<br />

LC-6 Prue Road at French Creek 3 ICL Prelim<strong>in</strong>ary Design $ 6,800,000<br />

LC37 Helotes Creek RSWF 2 OCL Plann<strong>in</strong>g $ 5,500,000<br />

LC5 S. Hausman LWC @ French Creek 3 ICL Plann<strong>in</strong>g $ 13,000,000<br />

LC26 N. Verde Rd. LWC @ French Creek 3 ICL Plann<strong>in</strong>g $ 5,200,000<br />

Total Budget $ 127,520,000<br />

~$128 M Bexar County Commitment to<br />

<strong>Flood</strong> Control <strong>in</strong> <strong>the</strong> April 29th Storm’s Vic<strong>in</strong>ity