REGULATORY CROSS REFERENCE MATRICES<br />

40 CFR 112.7 General Requirements for SPCC Plans ICP Citation(s)<br />

(f)(1-3) 7.6<br />

(g)(1-5) 7.8<br />

(h)(1-3) 7.12<br />

(i) 7.14<br />

(j) 7.15<br />

40 CFR 112, Subpart B – Requirements for Petroleum Oils and Non-Petroleum Oils,<br />

Except Animal Fats and Oils and Greases, and Fish and Marine Mammal Oils; and<br />

Vegetable Oils (Inlcuding Oils from Seeds, Nuts, Fruits, and Kernels)<br />

40 CFR 112.8 SPCC Plan Requirements for Onshore Facilities (excluding production<br />

facilities).<br />

(a) 8.1<br />

(b)(1-5) 8.2<br />

(c)(1-11) 8.3, 8.4, 8.5, 8.6<br />

(d)(1-5) 8.7<br />

40 CFR 112.9 SPCC Plan requirements for onshore oil 8.9<br />

production facilities.<br />

40 CFR 112.10 SPCC Plan requirements for onshore oil drilling<br />

and workover facilities.<br />

40 CFR 112.11 SPCC Plan requirements for offshore drilling,<br />

production, or workover facilities.<br />

40 CFR 112, Subpart C – Requirements for Animal Fats and Oils<br />

and Greases, and Fish and Marine Mammal Oils; and Vegetable<br />

Oils, Including Oils from Seeds, Nuts, Fruits, and Kernels.<br />

8.10<br />

8.11<br />

Not Applicable<br />

40 CFR112, Subpart D – Response Requirements<br />

40 CFR 112.20 Facility Response Plans 9<br />

40 CFR 109.5 State, Local, and Regional Oil Removal Contingency Plans<br />

40 CFR 109.5, State, Local, and Regional Oil Removal Contingency Plans<br />

(a) 10<br />

(b)(1-4) 16.1 - 16.4<br />

(c) (1-3) 16.5<br />

(d) 16.6<br />

(e) 16.7<br />

Oil Discharge Contingency Plan (9 VAC 25-91-170)<br />

9 VAC 25-91-170 A.1 7.1.3<br />

9 VAC 25-91-170 A.2 7.1.2<br />

9 VAC 25-91-170 A.3 7.1.4<br />

9 VAC 25-91-170 A.4 7.3.1<br />

MTC – Fort Pickett<br />

Integrated Contingency Plan<br />

Blackstone, Virginia<br />

September 2009 (DRAFT) Page D-3