Table 3 - Potential Spill Risk Analysis<br />
Source<br />
Any<br />
AST<br />
Any<br />
AST<br />
Any<br />
UST<br />
Any<br />
UST<br />
Type of<br />
Failure<br />
Spill Direction<br />
Maximum<br />
Vol. Released<br />
(gallons)<br />
ASTs<br />
Spill Rate<br />
(gallon/min)<br />
Overfill Refer to Figures 2 to 18 and 2,500 25 1,500<br />
Rupture Refer to Figures 2 to 18 and Ranges from<br />
275 to 4,000<br />
gallons<br />
USTs<br />
Overfill Refer to Figures 2 to 18 and 2,500 25 NA<br />
Rupture/<br />
Leaks<br />
To groundwater<br />
Ranges from<br />
150 to 30,000<br />
gallons<br />
Containment<br />
(gallons)<br />
10 Most tanks have double walled hull,<br />
some tanks with inadequate spill<br />
containment<br />
Varies<br />
NA<br />
Source<br />
Drums<br />
Type of<br />
Failure<br />
Rupture/<br />
Leaks<br />
Table 3 - Potential Spill Risk Analysis<br />
Spill Direction<br />
Maximum<br />
Vol. Released<br />
(gallons)<br />
Other<br />
Spill Rate<br />
(gallon/min)<br />
Containment<br />
(gallons)<br />
Refer to Figures 2 to 18 and 55 Instantaneous Within POL Bldg. 4,760 gallons<br />
7.3.5 Containment and Diversionary Structures – Onshore [40 CFR 112.7(c)(1)]<br />
Most ASTs on MTC-Fort Pickett contain fuel oil used to heat adjacent buildings. Any new AST<br />
installed on MTC-Fort Pickett is, at a minimum, compatible for material stored, double-walled,<br />
and usually will be vaulted and two-hour fire-rated. The ASTs also come equipped with overfill<br />
prevention and overfill containment systems, which are “fail-safe” engineered and an audible<br />
filling alarm.<br />
There are two 500-gallon “diked” tanks located on MTC-Fort Pickett at Buildings 1556 and<br />
1307. The floor and walls of the containment is made of concrete, and has been determined to<br />
be impervious. All 55-gallon drum storage has sufficient secondary containment. The drums are<br />
housed inside a specialized designed building at each of the tenant compounds. Each<br />
containment capacity, if needed, has sufficient freeboard for precipitation (40 CFR part 112.7<br />
(c)(1)(i)).<br />
In accordance with 40 CFR part 112.7 (c) (1)(iv), each tenant organization has an ample supply<br />
of spill equipment to control all minor spills that may occur at their facility. MTC-Fort Pickett<br />
has a central storage facility for spill equipment at the Hazardous Waste Accumulation Facility,<br />
Building 2361. Each tenant organization has approval to pick up any equipment it deems<br />
necessary to clean up an accidental release of POLs. The facility has 100 feet of booms, 500<br />
pounds of oil dri, 50 packages of 16 ½ by 20 absorbent pads (200 sheets per package), 95-gallon<br />
over-pack drums filled with various spill equipment, empty drums and a roll off container for<br />
MTC – Fort Pickett<br />
Integrated Contingency Plan<br />
Blackstone, Virginia<br />
October 2009 Page 28