Table 3 - Potential Spill Risk Analysis<br />

Source<br />

Any<br />

AST<br />

Any<br />

AST<br />

Any<br />

UST<br />

Any<br />

UST<br />

Type of<br />

Failure<br />

Spill Direction<br />

Maximum<br />

Vol. Released<br />

(gallons)<br />

ASTs<br />

Spill Rate<br />

(gallon/min)<br />

Overfill Refer to Figures 2 to 18 and 2,500 25 1,500<br />

Rupture Refer to Figures 2 to 18 and Ranges from<br />

275 to 4,000<br />

gallons<br />

USTs<br />

Overfill Refer to Figures 2 to 18 and 2,500 25 NA<br />

Rupture/<br />

Leaks<br />

To groundwater<br />

Ranges from<br />

150 to 30,000<br />

gallons<br />

Containment<br />

(gallons)<br />

10 Most tanks have double walled hull,<br />

some tanks with inadequate spill<br />

containment<br />

Varies<br />

NA<br />

Source<br />

Drums<br />

Type of<br />

Failure<br />

Rupture/<br />

Leaks<br />

Table 3 - Potential Spill Risk Analysis<br />

Spill Direction<br />

Maximum<br />

Vol. Released<br />

(gallons)<br />

Other<br />

Spill Rate<br />

(gallon/min)<br />

Containment<br />

(gallons)<br />

Refer to Figures 2 to 18 and 55 Instantaneous Within POL Bldg. 4,760 gallons<br />

7.3.5 Containment and Diversionary Structures – Onshore [40 CFR 112.7(c)(1)]<br />

Most ASTs on MTC-Fort Pickett contain fuel oil used to heat adjacent buildings. Any new AST<br />

installed on MTC-Fort Pickett is, at a minimum, compatible for material stored, double-walled,<br />

and usually will be vaulted and two-hour fire-rated. The ASTs also come equipped with overfill<br />

prevention and overfill containment systems, which are “fail-safe” engineered and an audible<br />

filling alarm.<br />

There are two 500-gallon “diked” tanks located on MTC-Fort Pickett at Buildings 1556 and<br />

1307. The floor and walls of the containment is made of concrete, and has been determined to<br />

be impervious. All 55-gallon drum storage has sufficient secondary containment. The drums are<br />

housed inside a specialized designed building at each of the tenant compounds. Each<br />

containment capacity, if needed, has sufficient freeboard for precipitation (40 CFR part 112.7<br />

(c)(1)(i)).<br />

In accordance with 40 CFR part 112.7 (c) (1)(iv), each tenant organization has an ample supply<br />

of spill equipment to control all minor spills that may occur at their facility. MTC-Fort Pickett<br />

has a central storage facility for spill equipment at the Hazardous Waste Accumulation Facility,<br />

Building 2361. Each tenant organization has approval to pick up any equipment it deems<br />

necessary to clean up an accidental release of POLs. The facility has 100 feet of booms, 500<br />

pounds of oil dri, 50 packages of 16 ½ by 20 absorbent pads (200 sheets per package), 95-gallon<br />

over-pack drums filled with various spill equipment, empty drums and a roll off container for<br />

MTC – Fort Pickett<br />

Integrated Contingency Plan<br />

Blackstone, Virginia<br />

October 2009 Page 28