17.09.2015 Views

INTEGRATED CONTINGENCY PLAN Maneuver Training Center

integrated contingency plan maneuver training center fort pickett ...

integrated contingency plan maneuver training center fort pickett ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Building<br />

Assigned<br />

Tank ID<br />

Table 2 - Inventory of Petroleum USTs at MTC Fort Pickett<br />

Volume<br />

(gallons)<br />

Material<br />

Stored<br />

Installation<br />

Year<br />

Construction<br />

Material<br />

Secondary<br />

Containment<br />

Adequate Spill<br />

Prevention<br />

2474* T-2474B 10000 JP-8 1995 Fiberglass Double-walled Yes<br />

2474* T-2474C 15000 Diesel 1995 Fiberglass Double-walled Yes<br />

2474* T-2474D 15000 Diesel 1995 Fiberglass Double-walled Yes<br />

2474* T-2474E 20000 Diesel 1995 Fiberglass Double-walled Yes<br />

2474* T-2474F 20000 Diesel 1995 Fiberglass Double-walled Yes<br />

2474* T-2474G 20000 Diesel 1995 Fiberglass Double-walled Yes<br />

2474* T-2474H 20000 Diesel 1995 Fiberglass Double-walled Yes<br />

2474* T-2474J 30000 JP-8 1995 Fiberglass Double-walled Yes<br />

2870* T-2870-1 15000 JP-8 1992 Fiberglass Double-walled Yes<br />

2870* T-2870-2 15000 JP-8 1992 Fiberglass Double-walled Yes<br />

Total 276,000<br />

*Regulated UST<br />

Petroleum is also stored in containers, such as 55-gallon drums, throughout MTC-Fort Pickett,<br />

but primarily at MATES, FMS #15, Facilities Engineering Roads and Grounds, and 99 th RSC<br />

88 th ECS and DRS Technologies 49 th Group FPTM.<br />

Each of the following twelve subsections has a site diagram illustrating the position of the<br />

various buildings and all petroleum storage within the facility. The attached diagrams also<br />

illustrate the predominant direction of surface water flow and the appropriate utilization and<br />

placement of control equipment in the case of a spill. The loading racks at Central Fueling<br />

Station #1, Vehicle Fueling Station #2, and Vehicle Fueling Station #3 are used to transfer fuel<br />

from the tank trucks to each UST at each site. Each of the loading racks described above is<br />

provided with adequate secondary containment to contain the largest compartment of any tank<br />

truck utilized in the facility.<br />

Spill equipment will be utilized to cleanup minor spills and the Facilities Engineering Division<br />

Roads and Grounds will respond along with MTC-Fort Pickett Fire Department to all others.<br />

Each tenant organization has various spill equipment locations within their compound.<br />

All tenant organizations receive their spill equipment from the dispensary at the 90-Day Waste<br />

Accumulation Facility, Building 2361. An outside contractor will be called from the list in<br />

Section 4.5 to compete the cleanup of any spills that the Fire Department and Roads and<br />

Grounds cannot handle.<br />

MTC – Fort Pickett<br />

Integrated Contingency Plan<br />

Blackstone, Virginia<br />

October 2009 Page 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!