12. GROUNDWATER CHARACTERIZATION STUDY [9 VAC 25-91-170 A.13.A]<br />

The operator of a facility with an aggregate aboveground storage or handling capacity of<br />

1,000,000 gallons or greater of oil is required to conduct a Groundwater Characterization Study<br />

within the geographic boundaries of the facility as part of the ODCP. MTC-Fort Pickett facility<br />

does not meet this 1,000,000-gallon threshold, and therefore, a groundwater characterization<br />

study is not required.<br />

MTC – Fort Pickett<br />

Integrated Contingency Plan<br />

Blackstone, Virginia<br />

October 2009 Page 57