Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
60 #ChangingLives<br />
#TransformingGhana<br />
#ChangingLives<br />
#TransformingGhana<br />
61<br />
Kpong Water Expansion Project<br />
Dawu, Abiriw, Akropong, Mamfe,<br />
Amanokrom, Tutu,Obosomase,<br />
Ahwerase, Aburi, Gyankama,<br />
Peduase, Kitase, Berekuso,<br />
Akwamufie, Mangoase, New Senchi,<br />
Akrade, Senchi, Domeabra, Lolonyo,<br />
Agomanya, Manya Kpongunor,<br />
Odumasi, Menekpo, Sra, Sawe and<br />
Ogome (all in the Eastern Region).<br />
About 250,000 inhabitants in these<br />
communities are benefiting from<br />
this project.<br />
4. TESHIE-NUNGUA DESALINATION<br />
WATER PROJECT<br />
The Teshie-Nungua Desalination<br />
Water Project, the first ever project<br />
of its kind in West Africa, has been<br />
completed and commissioned.<br />
It currently supplies 13.2 million<br />
gallons of water per day to about<br />
half a million people in the following<br />
areas - Teshie, Nungua, the Teshie<br />
Military barracks, Batsoona,<br />
Sakumono and parts of La-<br />
Dadekotopon.<br />
These four projects have added 65.7<br />
million gallons of water per day to<br />
the Greater Accra Metropolitan Area<br />
(GAMA) water supply system. With<br />
the previous shortfall of 63 million<br />
gallons per day, this has ensured<br />
that supply outstrips demand by 2.7<br />
million gallons.<br />
Work is currently ongoing to<br />
improve and extend the water<br />
distribution infrastructure in the<br />
GAMA. The US$ 48 million project<br />
will ensure the replacement of weak<br />
and over aged pipelines in Accra<br />
and Tema and also the laying of<br />
new pipelines to new settlements in<br />
GAMA . It will also allow utilisation<br />
of water from all the water supply<br />
expansion projects completed so far.<br />
5. GOVERNMENT HAS ALSO ADDED A<br />
<strong>TO</strong>TAL OF 14 MILLION GALLONS OF<br />
WATER PER DAY <strong>TO</strong> <strong>THE</strong> NATIONAL<br />
WATER S<strong>TO</strong>CK THROUGH <strong>THE</strong><br />
FOLLOWING PROJECTS:<br />
• Nsawam Water Supply Project -<br />
1.7 million gallons per day<br />
• Essakyir Water Supply Project<br />
(Phase 1) – 3.2 million gallons per<br />
day<br />
• Five Towns Water Supply Project<br />
(Kyebi, Osenase, Anyinam, Apedwa<br />
and Kwabeng) - 1.5 million gallons<br />
per day<br />
• Kumasi Water Supply Project<br />
(Barekese Expansion) – 6 million<br />
gallons per day<br />
• Asante Mampong Water Supply<br />
Project -1.6 million gallons per day<br />
6. WORK IS ALSO ONGOING ON <strong>THE</strong><br />
FOLLOWING PROJECTS, WHICH WILL<br />
ADD 25.4 MILLION GALLONS PER<br />
DAY <strong>TO</strong> <strong>THE</strong> WATER S<strong>TO</strong>CK WHEN<br />
COMPLETED IN 2016:<br />
• Kwahu Ridge Water Supply project<br />
- 3.5 million gallons per day<br />
• Kumawu Water Supply Project -<br />
3.6 million gallons per day<br />
• Konongo Water Supply Project -<br />
3.5 million gallons per day<br />
• Akim-Oda-Akwatia-Winneba<br />
Water Supply Project - 10.4 million<br />
gallons per day<br />
• Wa Water Supply Project - 3.3<br />
million gallons per day<br />
• North Tongu and Adaklu Anyigbe<br />
Water Supply Scheme - 1.1 million<br />
gallons per day<br />
• Interconnection of Sekyere-<br />
Hemang Water Treatment Plant to<br />
the Birimsu Water Treatment Plant<br />
• Interconnection of Sekyere-Hemang<br />
Water Treatment Plant to the<br />
Sekondi-Takoradi Water Supply<br />
System and the Aboadze Thermal<br />
Plant<br />
• Additional Works For Kumasi Water<br />
Supply Expansion Project<br />
• US$ 170 million Urban Water<br />
Project to rehabilitate 20 water<br />
supply systems in 8 Regions<br />
7. <strong>THE</strong>RE ARE SEVERAL PERI-<br />
URBAN, RURAL AND SMALL <strong>TO</strong>WN<br />
WATER AND SANITATION PROJECTS