13.01.2016 Views

ACCOUNTING TO THE PEOPLE

sD9IGrSs

sD9IGrSs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

106 #ChangingLives<br />

#TransformingGhana<br />

#ChangingLives<br />

#TransformingGhana<br />

107<br />

Burma Camp Road, Phase 2<br />

Spintex Road Bypass near<br />

Kotoka International Airport<br />

the Pra River. Twenty kilometers<br />

of Kumasi town roads have been<br />

upgraded with another 50km due<br />

for upgrade. Other major road<br />

projects ongoing in the Region<br />

include the Bomfa Junction-Asiwa-<br />

Bekwai, Bekwai-Ampaha-Asiwa,<br />

Kumawu-Timaate-Drobonso and<br />

Agyenkwaso-Anomabu-Gyadem<br />

Roads.<br />

The New Edubiase – Anomabo,<br />

Amantia – Obuasewa and Obuasi<br />

Junction – Dunkwa – Ayamfuri<br />

sections of the Region’s road<br />

network are also at various stages<br />

of implementation. A number of<br />

other roads in cocoa growing areas<br />

are at various stages of completion.<br />

These include the Ataase Nkwanta<br />

–Owusukrom and the Manfo-<br />

Subriso–Fanti Roads.<br />

Brong Ahafo Region<br />

Major roads in the Brong Ahafo<br />

Region which are being worked<br />

on include the Nsawkaw-Namase<br />

section of the Wenchi-Sampa Road,<br />

Berekum-Sampa, Atebubu-Kwame<br />

Danso-Kwadwokrom, Goaso-<br />

Kukuom Junction, Prang-Kintampo<br />

and Dormaa Ahenkro-Nkrankwanta<br />

Roads. Gambia No 2–Kyeremasu,<br />

Tepa Junction –Goaso (to link<br />

that part of Brong Ahafo to the<br />

Ashanti Region) and Kofibadukrom<br />

Junction –Kofibadukrom.<br />

Works are ongoing on; Dadiesoaba–<br />

Twabidi, Dormaa - Ahenkro–<br />

Baabianiha, Asuadei Junction<br />

– Asuadei, Antwirifo – Danyame<br />

Feeder Roads Project. Sunyani,<br />

Techiman, Nkoranza, Goaso and<br />

Dorma Ahenkro town roads have<br />

seen improvements<br />

Northern Region<br />

The 147-kilometre Sawla-Fufulso<br />

Road which includes rehabilitation<br />

of schools, health centres, markets<br />

and water treatment systems along<br />

that corridor in the Northern Region<br />

is complete.<br />

The Buipe-Tamale road<br />

rehabilitation project is also<br />

substantially completed. Works<br />

have commenced on the Busunu<br />

–Daboya road. The following<br />

roads are at various stages of<br />

completion; Daboya-Mankarigu-<br />

Wiase, including the Oti Damanko-<br />

Bimbila-Yendi Road, Yendi-<br />

Nakpanduri on the Eastern corridor,<br />

Nyankpala-Tolon, Tamale-Salaga,<br />

Chereponi–Yendi, Yendi-Tamale and<br />

Tamale-Kumbungu roads.<br />

Furthermore, there have been major<br />

improvements in Tamale town<br />

roads. About 30km of roads have<br />

been rehabilitated in the past two<br />

years.<br />

Another 25km are at various stages<br />

of construction. Roads in other<br />

urban areas in the region including<br />

Yendi, Savelugu, Damongo and Bole<br />

are being rehabilitated.<br />

Upper East Region<br />

Roads in the Upper East Region are<br />

receiving significant attention. These<br />

include:<br />

• 10 km of roads in the Bolgatanga<br />

municipality.<br />

• Navrongo and Bawku town roads<br />

• The Navrongo-Tumu,<br />

• Bolgatanga-Bongo,<br />

• Wikongo-Tongo<br />

• Navrongo-Tono<br />

• Bolga-Bawku,<br />

• Misiga-Kulungugu<br />

• Sandema-Wiesi<br />

Upper West Region<br />

The Wa municipality has seen a<br />

significant improvement in the road<br />

network. This includes the upgrade<br />

of 7km of town roads in 2014.<br />

Currently works are ongoing on the<br />

improvement of the road network on<br />

the UDS – Wa campus. Tumu roads<br />

have also been improved.<br />

Works are ongoing on the Nadowli-<br />

Lawra-Hamile, Wa-Bulenga and<br />

Wa-Dorimon roads together with<br />

construction of steel bridges on<br />

the Yala-Sombisi, Tantale-Tuvuu,<br />

Tuvuu-Lzabisi and Wa-Walewale<br />

roads.<br />

Other notable developments in the<br />

region include the ongoing work on<br />

the 39 km Jeffisi-Gwolu, and the<br />

Guono-Kperisi roads.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!