American House to Ashaley Botchway Road<br />
Giffard Road (37 Roundabout to Labadi Junction, Accra)<br />
Apedwa–Kyebi–Bunso and<br />
Koforidua – Bunso roads have<br />
all commenced in earnest.<br />
Furthermore, work has started<br />
on the 43.7 km Noyem-Winso-<br />
Amuana-Praso, Akim Sekyere-<br />
Abekoase, Mangoase-Kukua, and<br />
Chia-Brenase-Ofoase roads while<br />
that on the 3.3km Somanya town<br />
roads is progressing.<br />
Western Region<br />
In the Western Region, works on<br />
the Kansaworodo bypass as well<br />
as the 20 km asphalt overlay of<br />
selected roads in Sekondi-Takoradi<br />
is progressing steadily. The following<br />
towns will also benefit from the<br />
asphalt overlay programme: Tarkwa,<br />
Axim and Elubo. Works have started<br />
on the Daboase and Sefwi Wiawso<br />
town roads. Other towns to benefit<br />
from the programme include<br />
Prestea, Asankragua and Enchi.<br />
Work is far advanced on the 110 km<br />
Agona Junction-Elubo, the 94km<br />
Tarkwa-Bogoso Ayamfuri and the 52<br />
km Ayamfuri-Asawinso roads.<br />
The Sefwi-Bekwai-Eshiem,<br />
Sewfi-Wiawso-Akontombra,<br />
Prestea-Samreboi, Benchema-<br />
Oseikojokrom, Juaboso-Bodi and<br />
Akontombra Roads are progressing<br />
steadily. Other major road projects<br />
in the Western Region include<br />
Akontombra–Sefwi–Wiawso,<br />
Daboase–Atieku, Enchi–Dadieso,<br />
Anyinabrim–Sui–Bodi Junction,<br />
Prestea –Samreboi have all started.<br />
Also, work has commenced on<br />
the 51.20 km Edwenase-Atobiase,<br />
Juaboso-Dadieso, and Anto<br />
Dompen-Daboase rural roads. The<br />
construction of 10 km Oil and Gas<br />
Enclave roads along the pipe-line<br />
including the Amazure Bridge is<br />
on-going.<br />
Volta Region<br />
Many road projects have either<br />
been completed or are being<br />
worked on in the Volta Region.<br />
The Eastern Corridor project is<br />
progressing speedily. The Asikuma<br />
Junction-Have, Have-Hohoe-<br />
Jasikan, Dodo-Pepesu to Nkwanta,<br />
Nkwanta-Oti Damanko sections are<br />
under construction. Others include<br />
Kete Krachi to Buya, Ho-Fume,<br />
Kpando Worawora-Dambai, Bame-<br />
Dzolokpuita-Kpedze, Ho-Adidome,<br />
Metrikasa-Havedzi and Gwolokwati-<br />
Wli-Hohoe Roads.<br />
An additional 97.3 km comprising<br />
the Kpando-Alavanyo Kpeme-<br />
Nkonya-Gbi Wegbe, Aveti-Logba<br />
Alakpeti-Anfoega-Akukome-<br />
Aveti, Dalive-Agortage, Dove<br />
(Atitekpo Junction)-Mepe, Dove<br />
Junction-Dove-Aveyime, Dodi<br />
Papaase-Mensahkrom-Asuboi,<br />
Dapaa Jn-Pampawie-Ahamansu,<br />
and Tadzeva-Davego-Agorve<br />
Junction roads are also ongoing.<br />
Furthermore, rehabilitation<br />
of selected roads in the Ho<br />
Municipality including the access<br />
road to the University of Health and<br />
Allied Sciences are ongoing. The<br />
Kpando Town roads are also being<br />
rehabilitated.<br />
The Juapong to Fodzoku to Akuse<br />
Dam road and the Sogakope to<br />
Battor road have been completed.<br />
The Juapong to Abutia to Sokode<br />
road is also ongoing. The Hohoe<br />
Town Roads are also under<br />
construction.<br />
Central Region<br />
Work has started on the Kasoa<br />
Interchange. The scope of works on<br />
the project is as follows:<br />
1 .Construction of three interchanges<br />
on the main Accra-Cape Coast Road<br />
at the following locations:<br />
I. Main Kasoa Traffic Lights<br />
II. Galilee/Iron City to link Iron City<br />
to Amanfrom (without U-turns on<br />
the main road)<br />
III. Universal/CP junction to link<br />
Universal to the Opeikuma Area in<br />
Kasoa<br />
2. Widening of main Accra-Cape