28.11.2017 Views

HELP Hydrocarbon Exploration and Licensing Policy

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tamil Research Institution (TRI)<br />

Table 7.2 : In-Place CBM Reserves<br />

Sl.<br />

No.<br />

State Block name Operator<br />

Approx<br />

area (sq.<br />

km.)<br />

GIIP<br />

(BCM)<br />

GIIP<br />

(TCF)<br />

Recoverable<br />

Reserves (BCM)<br />

Recoverable<br />

Reserves (TCF)<br />

1 West Bengal RG(E)-CBM-2001/1 EOL 500 60.881 2.15 28.12 0.993<br />

2 Jharkh<strong>and</strong> BK-CBM-2001/1 ONGC 95 30.182 1.06 3.68 0.130<br />

3 Jharkh<strong>and</strong> NK-CBM-2001/1 ONGC 340 9.529 0.34 1.46 0.052<br />

4 Madhya Pradesh SP(E)-CBM-2001/1 RIL 495 47.855 1.69 17.56 0.620<br />

5 Madhya Pradesh SP(W)-<br />

CBM-2001/1<br />

RIL 500 55.501 1.96 18.97 0.670<br />

6 West Bengal RANIGANJ NORTH ONGC 350 7.430 0.26 1.86 0.066<br />

7 Jharkh<strong>and</strong> JHARIA ONGC 85 14.610 0.52 3.04 0.107<br />

8 West Bengal RANIGANJ SOUTH GEECL 210 54.368 1.92 37.94 1.340<br />

Total 2575 280.357 9.9 112.63 3.978<br />

Table 7.3 : Snapshot of CBM in India<br />

CBM <strong>Policy</strong> formulated in: 1997<br />

MoU signed between MoP&NG & MoC 09.09.1997<br />

Total CBM rounds conducted 4<br />

No. of CBM Blocks awarded 33<br />

Coal bearing Area identified for CBM<br />

Area covered under 33 CBM Blocks<br />

CBM Resources identified in the area made available (26,000 sq. km.)<br />

26,000 Sq. Km.<br />

16, 613 Sq. Km.<br />

2600 BCM (91.8 TCF)<br />

CBM Resources (in 33 Blocks) 1767 BCM (62.4 TCF )<br />

Established CBM Reserves (Gas in Place-GIP)<br />

280.34 BCM (9.9TCF)<br />

Commercial Production commenced July 2007<br />

Total No. of CBM Wells drilled 725<br />

Investment made so far<br />

Present Gas Production (as on March 2016)<br />

USD 1.4 Billion<br />

1.168 MMSCMD from 4 CBM blocks<br />

No. of CBM Blocks in Production Phase 2<br />

No. of CBM Blocks in Development Phase 6<br />

No. of CBM Blocks in <strong>Exploration</strong> Phase 4<br />

No. of CBM Blocks relinquished 4<br />

No. of CBM Blocks awaiting PEL 2<br />

No. of CBM Blocks under relinquishment 14<br />

Annual CBM production in FY 2015-16<br />

392.87 MMSCM<br />

104<br />

Unconventional <strong>Hydrocarbon</strong>s<br />

www.tamilri.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!