HELP Hydrocarbon Exploration and Licensing Policy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Tamil Research Institution (TRI)<br />
Table 7.2 : In-Place CBM Reserves<br />
Sl.<br />
No.<br />
State Block name Operator<br />
Approx<br />
area (sq.<br />
km.)<br />
GIIP<br />
(BCM)<br />
GIIP<br />
(TCF)<br />
Recoverable<br />
Reserves (BCM)<br />
Recoverable<br />
Reserves (TCF)<br />
1 West Bengal RG(E)-CBM-2001/1 EOL 500 60.881 2.15 28.12 0.993<br />
2 Jharkh<strong>and</strong> BK-CBM-2001/1 ONGC 95 30.182 1.06 3.68 0.130<br />
3 Jharkh<strong>and</strong> NK-CBM-2001/1 ONGC 340 9.529 0.34 1.46 0.052<br />
4 Madhya Pradesh SP(E)-CBM-2001/1 RIL 495 47.855 1.69 17.56 0.620<br />
5 Madhya Pradesh SP(W)-<br />
CBM-2001/1<br />
RIL 500 55.501 1.96 18.97 0.670<br />
6 West Bengal RANIGANJ NORTH ONGC 350 7.430 0.26 1.86 0.066<br />
7 Jharkh<strong>and</strong> JHARIA ONGC 85 14.610 0.52 3.04 0.107<br />
8 West Bengal RANIGANJ SOUTH GEECL 210 54.368 1.92 37.94 1.340<br />
Total 2575 280.357 9.9 112.63 3.978<br />
Table 7.3 : Snapshot of CBM in India<br />
CBM <strong>Policy</strong> formulated in: 1997<br />
MoU signed between MoP&NG & MoC 09.09.1997<br />
Total CBM rounds conducted 4<br />
No. of CBM Blocks awarded 33<br />
Coal bearing Area identified for CBM<br />
Area covered under 33 CBM Blocks<br />
CBM Resources identified in the area made available (26,000 sq. km.)<br />
26,000 Sq. Km.<br />
16, 613 Sq. Km.<br />
2600 BCM (91.8 TCF)<br />
CBM Resources (in 33 Blocks) 1767 BCM (62.4 TCF )<br />
Established CBM Reserves (Gas in Place-GIP)<br />
280.34 BCM (9.9TCF)<br />
Commercial Production commenced July 2007<br />
Total No. of CBM Wells drilled 725<br />
Investment made so far<br />
Present Gas Production (as on March 2016)<br />
USD 1.4 Billion<br />
1.168 MMSCMD from 4 CBM blocks<br />
No. of CBM Blocks in Production Phase 2<br />
No. of CBM Blocks in Development Phase 6<br />
No. of CBM Blocks in <strong>Exploration</strong> Phase 4<br />
No. of CBM Blocks relinquished 4<br />
No. of CBM Blocks awaiting PEL 2<br />
No. of CBM Blocks under relinquishment 14<br />
Annual CBM production in FY 2015-16<br />
392.87 MMSCM<br />
104<br />
Unconventional <strong>Hydrocarbon</strong>s<br />
www.tamilri.com