2. Technical Description<br />
Area(s) of intervention (sectors as specified in the SEAP proposed by CoM)<br />
RES generation<br />
Site / Place<br />
Free land on AlJoun Area (located within <strong>Karak</strong> Greater Municipality<br />
region).<br />
New<br />
Main adopted Technology & Equipment<br />
Wheeling Photovoltaic system (on-grid system)<br />
consists of electrical panels, inverter and main<br />
Board distribution.<br />
Planned<br />
Status of the action<br />
Under implementation<br />
(x)<br />
Start date Project Lifetime Previous or linked studies<br />
Following<br />
previous action<br />
April/2017 2 years Based on the energy service provider assessments<br />
Engineering Studies Not available<br />
Implementation TBD<br />
plan / Construction<br />
plan<br />
Other previous<br />
studies<br />
Environmental<br />
impact assessment<br />
Not needed<br />
Not applicable<br />
3. Organization and procedures<br />
Formal approval<br />
The project approved by the municipal manager.<br />
Staff allocated to prepare, implement and monitor the action<br />
The concerned staff in the municipality<br />
Local contractor<br />
4. Cost Estimates<br />
Initial and start-up<br />
expenses<br />
Operational Costs<br />
(approx.)<br />
Annual Income<br />
(approx.)<br />
5. Funding Sources<br />
Technical Assistance Needs<br />
Legal responsible body<br />
<strong>Karak</strong> Greater Municipality.<br />
943,200€ annually for first three years<br />
445,400€ for the fourth year Net Present Value<br />
720,000 JOD annually for first three years<br />
340,000 JOD for the fourth year<br />
801,456€<br />
611,798 JOD<br />
Municipal / City Staff Training Needs<br />
Training for the technical staff in the municipality<br />
about the operation and maintenance.<br />
(NPV)<br />
Role of Partners<br />
Technical partners (new electricity company, local<br />
companies dealing with PV installation and<br />
electric equipment maintenance) will be engaged<br />
in the program in order to ensure that a proper<br />
network of services can follow on PV development<br />
and maintenance.<br />
3,849,292 € (14 years)<br />
2,938,391 JOD<br />
(14 years )<br />
Return of Investment (IRR)<br />
74%<br />
Local Authority’s own resources<br />
National Funds and Programs<br />
Funding Source<br />
Fund<br />
Municipal Budget<br />
113