- Page 1 and 2:
This project is funded by the Europ
- Page 3 and 4:
Table of Contents List of Figures .
- Page 5 and 6:
3.4.5 Replacing existing electric w
- Page 7 and 8:
List of Figures Figure 1: Energy co
- Page 9 and 10:
Table 45: Action 4.4 in numbers ...
- Page 11 and 12:
Executive Summary Al-Karak lies 140
- Page 13 and 14:
Total Energy Consumption (GWh) Publ
- Page 15 and 16:
Action Energy Savings (MWh) Energy
- Page 17 and 18:
achieved based on the actions sugge
- Page 19 and 20:
Chapter 1: Introduction 1.1 Karak 2
- Page 21 and 22:
Temperature ( o C) severe water sca
- Page 23 and 24:
1.2.6 Infrastructures The registere
- Page 25 and 26:
1.4.2 Adaptation of administrative
- Page 27 and 28:
2.1.4 Emission factors and Conversi
- Page 29 and 30:
According to the above presented da
- Page 31 and 32:
Based on the above, the solar therm
- Page 33 and 34:
Energy consumption (MWh) 80,000.00
- Page 35 and 36:
Table 11: Energy consumption in Pri
- Page 38 and 39:
2.3 Local electricity production In
- Page 40 and 41:
Table 13: Solid waste composition i
- Page 43 and 44:
2.5 Results’ Graphical Analysis T
- Page 46 and 47:
Chapter 3: SECAP Actions 3.1 Target
- Page 48 and 49:
In the next sections a more detaile
- Page 50 and 51:
3.2.3 Awareness raising activities
- Page 52 and 53:
Table 21: Action 1.5 in numbers Eff
- Page 54 and 55:
3.2.10 Web portal creation The crea
- Page 56 and 57:
3.3.3 Green procurement procedures
- Page 58 and 59:
een considered an average rate with
- Page 60 and 61:
A penetration level of the SWH in 3
- Page 62 and 63:
3.4.9 Replacement of single glazing
- Page 64 and 65:
3.5.2 The 10% voluntary campaign fo
- Page 66 and 67:
3.5.5 10/20 MWp Photovoltaics in ro
- Page 68 and 69:
in existing buildings is considered
- Page 70 and 71:
the technologies and their results,
- Page 72 and 73:
3.6.2 Installation of Global Positi
- Page 74 and 75:
Table 62: Action 5.6 in numbers Imp
- Page 76 and 77:
Table 66: Action 5.10 in numbers Tr
- Page 78 and 79:
Action Energy Savings (MWh) Energy
- Page 80 and 81:
Action Energy Savings (MWh) Energy
- Page 82:
3.9 Monitoring Monitoring of the Mu
- Page 86:
Action Key Performance Indicators M
- Page 90:
Action Key Performance Indicators M
- Page 94 and 95: Chapter 4: Adaptation to climate ch
- Page 96 and 97: Figure 26: Seasonal (winter: Decemb
- Page 98 and 99: Water, via a change of its cycle du
- Page 100 and 101: Figure 28: Temperature Map of Jorda
- Page 102 and 103: Figure 31: Average Precipitation be
- Page 104 and 105: 4.5 Risk Assessment and Vulnerabili
- Page 107: Receptors Extreme weather event Pot
- Page 111: Receptors Extreme weather event Pot
- Page 114 and 115: Receptors Weather Sensitivity Futur
- Page 116 and 117: are presented in the following tabl
- Page 118 and 119: 4.6.2 Infrastructure The next secti
- Page 120 and 121: Integrated land use planning with z
- Page 122 and 123: Elaboration of water and ground wat
- Page 124 and 125: Moreover the CO2 emissions reductio
- Page 126 and 127: Awareness raising related to the Co
- Page 128 and 129: 2. Technical Description Area(s) of
- Page 130 and 131: 5.3 #3 - Replacing the old Municipa
- Page 132 and 133: Implementation plan / Construction
- Page 134 and 135: 5.4 #4 - Bio Waste Management Bio W
- Page 136 and 137: Other previous studies Environmenta
- Page 138 and 139: 5.5 #5 - Making the Municipal Build
- Page 140 and 141: Municipal buildings 1. Solar Photo
- Page 144 and 145: o Pools of benchmark examples and r
- Page 146 and 147: and the proposed pilot actions in t
- Page 148 and 149: III. Identification of level of awa
- Page 150 and 151: Template 3.1 Identification of CAPP
- Page 152 and 153: Template 3.2 CAPP activities as rel
- Page 154 and 155: 3- Building a wind farm to produce
- Page 156 and 157: Recommendations: These tables have
- Page 158 and 159: Appendix Appendix A Public Lighting
- Page 161: Trailer 2 1 Semi- 0,39 19,50 Diesel
- Page 165: The European Union is made up of 28