Hillingdon SuDS Design & Evaluation Guide
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
9.7.5 Water quality design checklist<br />
Item<br />
What is being checked<br />
Method of Sensitivity of receptor and level of<br />
discharge treatment required<br />
Treatment Sufficient treatment in place protecting<br />
site biodiversity and amenity assets and<br />
the wider environment.<br />
Evidence of source control, subcatchments<br />
and management train.<br />
Infiltration Presence of SPZ’s, contaminated land,<br />
depth to seasonal high groundwater table.<br />
Information presented for<br />
assessment<br />
<strong>Design</strong> statement to specify method of<br />
discharge and sensitivity of receptor.<br />
Layout drawing clearly indicating <strong>SuDS</strong><br />
components and management train.<br />
Details of Indices approach and<br />
infiltration screening assessment (as<br />
appropriate).<br />
Coordinated constraints plan. Evidence<br />
of discussion with EA where appropriate<br />
Detailed <strong>Design</strong><br />
Construction<br />
Demonstration of how site runoff could be<br />
Section of the drainage design<br />
phase<br />
managed during construction to minimise<br />
the risk of pollution to the wider<br />
statement outlining a potential approach<br />
for construction runoff management.<br />
environment due to silty construction<br />
Contractors will be responsible for<br />
runoff.<br />
uptake.<br />
Operation and<br />
Operation and maintenance should be<br />
Concise operation and maintenance<br />
maintenance<br />
plan<br />
simple to understand and easy to<br />
implement. Where available, <strong>SuDS</strong> design<br />
should deploy natural treatment process<br />
plan. Description of tasks and detailing<br />
of where personnel are required to visit<br />
site to remove hydrocarbon based<br />
106<br />
to breakdown organic pollutants passively.<br />
pollutants (i.e. organic pollutants have<br />
Contingency measures in the event of a<br />
minor / major spillage<br />
not been fully broken down passively as<br />
part of <strong>SuDS</strong> treatment process).<br />
Plan indicating potential for containment<br />
and positioning of spill kits (as<br />
appropriate)<br />
London Borough of <strong>Hillingdon</strong> <strong>SuDS</strong> D & E <strong>Guide</strong><br />
© 2018 McCloy Consulting & Robert Bray Associates