02.03.2018 Views

Hillingdon SuDS Design & Evaluation Guide

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9.7.5 Water quality design checklist<br />

Item<br />

What is being checked<br />

Method of Sensitivity of receptor and level of<br />

discharge treatment required<br />

Treatment Sufficient treatment in place protecting<br />

site biodiversity and amenity assets and<br />

the wider environment.<br />

Evidence of source control, subcatchments<br />

and management train.<br />

Infiltration Presence of SPZ’s, contaminated land,<br />

depth to seasonal high groundwater table.<br />

Information presented for<br />

assessment<br />

<strong>Design</strong> statement to specify method of<br />

discharge and sensitivity of receptor.<br />

Layout drawing clearly indicating <strong>SuDS</strong><br />

components and management train.<br />

Details of Indices approach and<br />

infiltration screening assessment (as<br />

appropriate).<br />

Coordinated constraints plan. Evidence<br />

of discussion with EA where appropriate<br />

Detailed <strong>Design</strong><br />

Construction<br />

Demonstration of how site runoff could be<br />

Section of the drainage design<br />

phase<br />

managed during construction to minimise<br />

the risk of pollution to the wider<br />

statement outlining a potential approach<br />

for construction runoff management.<br />

environment due to silty construction<br />

Contractors will be responsible for<br />

runoff.<br />

uptake.<br />

Operation and<br />

Operation and maintenance should be<br />

Concise operation and maintenance<br />

maintenance<br />

plan<br />

simple to understand and easy to<br />

implement. Where available, <strong>SuDS</strong> design<br />

should deploy natural treatment process<br />

plan. Description of tasks and detailing<br />

of where personnel are required to visit<br />

site to remove hydrocarbon based<br />

106<br />

to breakdown organic pollutants passively.<br />

pollutants (i.e. organic pollutants have<br />

Contingency measures in the event of a<br />

minor / major spillage<br />

not been fully broken down passively as<br />

part of <strong>SuDS</strong> treatment process).<br />

Plan indicating potential for containment<br />

and positioning of spill kits (as<br />

appropriate)<br />

London Borough of <strong>Hillingdon</strong> <strong>SuDS</strong> D & E <strong>Guide</strong><br />

© 2018 McCloy Consulting & Robert Bray Associates

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!